Publications Office of the EU
Design (in the field of traffic and telecommunications) and execution of works for the task entitled: Section 3 - construction works on railway line No. 201 Wierzchucin – Lipowa Tucholska and sec. Maksymilianowo – Wierzchucin (with regard to the development of a dynamic passenger information and video monitoring system) within the framework of the project ‘Works on the section Maksymilianowo – Kościerzyna’ - EU tenders
DisplayCustomHeader
Procurement Detail Actions Portlet
OP Portal - Procurement - Details

This page contains content generated automatically to improve findability and accessibility

- indicates text translated automatically in your browsing language

Design (in the field of traffic and telecommunications) and execution of works for the task entitled: Section 3 - construction works on railway line No. 201 Wierzchucin – Lipowa Tucholska and sec. Maksymilianowo – Wierzchucin (with regard to the development of a dynamic passenger information and video monitoring system) within the framework of the project ‘Works on the section Maksymilianowo – Kościerzyna’

  • Published
    09/01/2026
  • Deadline
    16/01/2026
  • Opening of tenders
    16/01/2026
  • Today
    16/05/2026
Status
Submission closed
Type of contract
Works
Subject for Renewal
No
Buyer
PKP Polskie Linie Kolejowe S.A.
Place of performance
NUTS code: Multiple place of performance
Location of buyer
NUTS code: PL911 Miasto Warszawa
Business sector (Main CPV)
45000000 Construction work
Total estimated contract value (excluding VAT)
Not available
Total final contract value (excluding VAT)
Not available
Tender reference number
9090/IRZR2/04305/03972/25/P
Description

The subject of the Order is: Design (in the field of traffic and telecommunications) and execution of works for the task entitled: Section 3 - construction works on railway line No. 201 Wierzchucin – Lipowa Tucholska and sec. Maksymilianowo – Wierzchucin (with regard to the development of a dynamic passenger information and video monitoring system) under the project ‘Works on the section Maksymilianowo – Kościerzyna’. The entire subject of the Order includes the execution of the following elements: Execution of works in the scopes (Task A): 1) track works, 2) platforms, 3) overhead contact line, 4) line of non-traction needs 15kV, 5) power equipment and systems up to 1 kV, 6) road systems, 7) engineering structures, 8) cubature structures, 9) passages and crossings, 10) works involving the construction of facilities for environmental protection, 11) geotechnics, 12) dendrology, 13) reconstruction of ditches and watercourses from the construction of engineering structures, 14) small architecture, 15) land development. Development of projects along with the implementation of works in the scopes (Task B): 1) railway traffic control equipment (srk), 2) telecommunications networks and equipment and systems, Development of multi-branch projects along with the implementation of works in the scope of (Task C): 1) connection of the existing track LK743 with the designed station Lipowa Tucholska described in TOMIE III SWZ PFU. As-built documentation, including: • development of technical regulations, in cooperation with the Ordering Party, on the basis of Instruction Ir-3, after completion of construction works, in all sectors, • development of as-built geodetic documentation: - line picket and longitudinal profile of the railway line, - protocols of passing and receiving signs of track axis adjustment, - numerical situational-height map with as-built geodetic inventory, • development of documentation from the assumption and measurement of Railway basic geodetic warp and Railway special warp, • development of new diagrams of traffic stations and expedition points. The interface options are described in section 5.1.1 Destination, in the field: Description of options. Detailed Description of the subject of the Order has been presented in the scope of: - Tasks A: the descriptive and drawing part of the Design Documentation, Technical Specifications for the Execution and Acceptance of Construction Works (STWIORB) constituting Volume III of the SWZ and in the Measurement of Works constituting a separate Volume IV of the SWZ, - Task B was presented in the PFU constituting Volume III of the SWZ, - Task C was presented in the PFU constituting Volume III of the SWZ, - Option for the Interface was presented in the PFU constituting Volume III of the SWZ The project ‘Works on the section Maksymilianowo – Kościerzyna’ received funding from the European Union under the European Funds for Infrastructure, Climate, Environment 2021-2027

Submission Method
Electronic via:
https://platformazakupowa.plk-sa.pl
Tenders may be submitted
Electronic submission: required
https://platformazakupowa.plk-sa.pl
Information about a public contract, a framework agreement or a dynamic purchasing system (DPS)
Not available
Conditions for opening tenders (date)
16/01/2026 09:30
Place of performance
Award method
Criterion:
Type: price
Description: Całkowita cena brutto – waga: 100 % za Zakres podstawowy i zakres objęty Opcją na interfejs
Weight (percentage, exact):
Estimated value
Not available
Final contracted value
Not available
Award of contract
Not available
Prior information
Contract
Award
Footnote - legal notice

This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.