-
Published08/04/2024
-
Deadline03/05/2024
-
Today23/08/2026
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Educational campus St. Martin in the Sulmtal ROOMER
The project “BC St. Martin im Sulmtal” consists of 3 construction phases: Phase 1: not part of the contract: Demolition of the existing object (destruction in May 2024). Phase 2: New construction of a kindergarten/crèche building with a suspended connecting building (turnal hall, multipurpose hall). The walls of the new building are built in brick or wood construction, the ceiling structure is made as reinforced concrete ceiling or wooden ceiling construction. The roof structure is constructed in steel or timber construction. The construction of the new building takes place during the ongoing school or KiGa operation in the neighboring elementary school building. Phase 3: Conversion of the existing elementary school building with a shaft for an elevator system, thermal refurbishment of the elementary school building. The reconstruction of phase 3 will take place during the summer holidays of 2024.
www.ausschreibung.at
www.ausschreibung.at
45400000 - Building completion work
45214000 - Construction work for buildings relating to education and research
45200000 - Works for complete or part construction and civil engineering work
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.