-
Published06/06/2025
-
Deadline17/06/2025
-
Opening of tenders17/06/2025
-
Today24/06/2025
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
"INTERMEDIATE TECHNICAL REVIEWS ON WAY CHECK LABORATORY VAGOANS" Text automatically translated in your browsing language Automatically translated
Note: Not all information for this procedure were successfully computed. Please consult linked documents for more details.
CNCF CFR SA owns in its fleet of rolling stock the laboratory wagons to check the geometry of the track, namely the wagons with circulation numbers 80539750500-1 and 80539750503-5, which perform annually, according to the instructions in force, dynamic measurements of the parameters of the track geometry on the entire railway network managed by C.N.C.F. "CFR" S.A. Wagons series UWSMC. In order to be able to perform dynamic measurements, these wagons must be roadworthy and in this respect, according to the instructions in force, they are periodically subject to a cycle of revisions and repairs. According to Order No 315/2011 of the Minister for Transport, supplemented and amended by Order No 1359/2012 of the Minister for Transport amending and supplementing the Railway Rules. Types of planned revisions and repairs. Time rules or mileage rules for carrying out scheduled revisions and repairs’, between two periodic repairs, these wagons perform intermediate RTI technical revisions every 12 months. The two laboratory wagons carried out the intermediate technical overhaul in August 2023. The RTI intermediate technical overhaul service for laboratory wagons to check track geometry is carried out by rolling stock repair units holding a certificate of conformity for maintenance functions, in accordance with Regulation (EU) 2019/779. During this type of overhaul, the wagon is checked at the channel, the wheelsets are checked without loosening, the ultrasonic control without dismantling the grease boxes, the automatic brake, the electrical installation, the heating system, etc. are checked. After performing the RTI, the wagons will be able to circulate and will be attached in the composition of the passenger trains, in circulation, in order to perform dynamic measurements of the parameters of the road geometry in conditions of traffic safety. In order to keep the wagons in circulation, an intermediate technical revision type RTI 3 is required. Any interested economic operator has the right to request clarifications/additional information in relation to the tender documentation until the 22nd day before the deadline for submission of tenders. The contracting entity will respond clearly and completely to all requests for clarifications/additional information in relation to the tender documentation on the 12th day before the deadline for submission of tenders. The contracting entity will not respond to requests for clarifications submitted after the deadline set. Any request for clarifications must be submitted in SEAP, signed with extended electronic signature. Quantity - 2 wagons with circulation numbers 80539750500-1 and 80539750503-5. Text automatically translated in your browsing language Automatically translated
https://www.e-licitatie.ro
https://www.e-licitatie.ro
50220000 - Repair, maintenance and associated services related to railways and other equipment
50222000 - Repair and maintenance services of rolling stock CVP code deduced from the text of the procedure AI-generated
71000000 - Architectural, construction, engineering and inspection services CVP code deduced from the text of the procedure AI-generated
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.