-
Published29/04/2024
-
Deadline03/06/2024
-
Awarded05/12/2024
-
Today19/09/2026
Utilities
- indicates CPV codes deduced from the text of the procedure
Contract Contract 1003 Joint rigging and operation framework - New Aker
Main assignments for joint rigging and operational services for framework: Establishment and operation of provisional electricity network Pipeline network and provisional HVAC installations, security guard services including security guard services, maintenance and alterations to internal roads, places and scaffolding Establishments and operation of external construction lifts Established cables and operation of tower cranes Equipment and machines for landlord maintenance and simple maintenance Survey waste from the builder office Diverse work on hours
https://permalink.mercell.com/228434666.aspx
https://permalink.mercell.com/228434666.aspx
45223800 - Assembly and erection of prefabricated structures
71326000 - Ancillary building services
45233222 - Paving and asphalting works
44211100 - Modular and portable buildings
45314310 - Installation of cable laying
45315300 - Electricity supply installations
45313100 - Lift installation work
71500000 - Construction-related services
45231300 - Construction work for water and sewage pipelines
71521000 - Construction-site supervision services
45215140 - Hospital facilities construction work
71520000 - Construction supervision services
75000000 - Administration, defence and social security services
33000000 - Medical equipments, pharmaceuticals and personal care products
Type: price
Description: The evaluation of the price will be based on the "evaluation sum excluding VAT", in Annex F1 Vederlaget.
Weight (percentage, exact): 70
Criterion: The offered key personnel ́ competence
Type: quality
Description: Key personnel means 1 project manager, 1 site manager and 1 HSE/QA manager. The evaluation of competence will be based on the following elements: 1. Education 2. Relevant experience from previous assignments (Reference Projects) The evaluation of relevant experience will be based on an overall assessment, with the following qualities included in the reference projects: •Size • Assignment length The three key persons must be able to participate in any negotiations. The key personnel ́s experience with rigging and operation which is included as a part of large turnkey contracts will be assessed as relevant in this context.
Weight (percentage, exact): 15
Criterion: Implementation plan
Type: quality
Description: Tenderers shall describe in their tender how the assignment is intended to be solved. The description should be brief and precise and it shall include: • A description of how the contractor intends to execute the project, including information on HSE, critical success factors and optimisation of the project. (maximum 4 pages) • Description of rigging, operation and logistics at the construction site. • Description of how the contractor intends to solve the lifting supervisor from SfS BA. • The tenderer ́s organisation chart with name and function. • Progress plan (on level 3) that shows that the implementation plan meets the contract ́s milestones. The schedule of progress must indicate dependencies and durations for the tasks. • An account of how the contract ́s climate and environmental requirements, requirements for the outer environment as well as other requirements connected to BREEAM shall be safeguarded. The contracting authority ́s assessment of the tenders under the award criteria Implementation Plan will be based on the Tenderer's descriptions as stated above.
Weight (percentage, exact): 15
Postal address:
Town: HAGAN
Postal code: 1481
Country:
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.