-
Awarded30/08/2024
-
Today17/04/2025
Utilities
- indicates text translated automatically in your browsing language
Framework contract for architectural and engineering services for general planning Renovation Text automatically translated in your browsing language Automatically translated
As part of the degewo construction plan, existing buildings are continuously being completely modernized and repaired, including testing of attic expansion and top floor extension as well as full or partial energy-efficient renovation of the building envelope and building technology to meet the degewo climate targets. It is assumed that a total of about 5-7 refurbishment projects will be carried out each year. The contractor must be able to work on several projects in parallel, as it is possible to work on several projects at the same time during the contract period. The scope of services includes architectural and engineering services in accordance with: - §§ 34 in conjunction with Annex 10 HOAI buildings, performance phase 1-9, - §§ 39 in conjunction with Annex 11 outdoor facilities HOAI performance phase 1-9, - §§ 51 in conjunction with Annex 14 structural design HOAI performance phase 1-6 and - §§ 55 in conjunction with Annex 15 technical equipment HOAI performance phase 1-9 in the current version. As a rule, the individual projects are commissioned in the following stages or partial services: 1st stage: Performance phase 1-2 of the HOAI as well as pro rata basic and special services. 2nd stage: Performance phase 3-4 of the HOAI as well as pro rata basic and special services. 3rd stage: Performance phase 5-7 of the HOAI (for structural design LPH 5-6) and pro rata basic and special services. 4th stage: Performance phase 8 of the HOAI (does not apply to structural design LPH 5-6) and pro rata basic and special services. 5.Stage: Performance phase 9 of the HOAI (does not apply to structural design) as well as pro rata basic and special services (including monitoring the rectification of defects within the limitation period). Additional services that may be required: - dimensional and technical inventory; - Contribute to the modernisation announcement and settlement; - compilation of window and facade surveys to determine the notional repair costs; - participation in the technical support of tenants before and during the construction project; - participation in the application for and settlement of funding; - preparation of heat insulation certificates, heat demand calculations; - development of at least 3 economically viable energy-efficient refurbishment options to reduce CO2 emissions in order to achieve the degewo climate targets; - preparation of rental documents and preparation for internet presentation; - Ecological construction support, species protection, tree protection. Projects will be distributed to the Framework Contract Partners as follows: All projects are assigned in the order of placement according to the award matrix as follows: 1. at the time of award of the framework contract by the amount of the gross construction costs on the basis of the project list available on that day and on an ongoing basis 2. in the case of new projects named after the date of award of the contract, regardless of the amount of the construction costs and on an ongoing basis. Continuous means: If all contractors have been assigned a project, the distribution of the projects starts from the beginning in the order of placement. Text automatically translated in your browsing language Automatically translated
Postal address:
Town: Berlin
Postal code: 12681
Country:
Official name: DAHM Architekten + Ingenieure GmbH
Postal address:
Town: Berlin
Postal code: 10243
Country:
Official name: GNEISE Planungs- und Beratungsgesellschaft mbH
Postal address:
Town: Berlin
Postal code: 12437
Country:
Official name: SPP Schüttauf und Persike Planungsgesellschaft mbH
Postal address:
Town: Berlin
Postal code: 12621
Country:
Official name: kba Architekten und Ingenieure GmbH
Postal address:
Town: Berlin
Postal code: 12489
Country:
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.