-
Published14/10/2025
-
Deadline19/11/2025
-
Today12/05/2026
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
REPAIR OF LOSSES DUE TO FLOODS & MODERNISATION, UPGRADE OF MEN - PHASE A
1. E/M and measuring equipment in the following units of the MEN: • old filter unit, • new filter unit, • post-chlorination unit • refined water outlet shaft, • collector shaft-twin tanks, • pumping stations of the network. This equipment includes: - Instruments for measuring supply, level, pressure, residual chlorine, turbidity, etc. - Speed regulators - Pumping assemblies 2. Automation, remote management and telemetry system consisting of: • Seven (7) Local Control Stations (TCS), • One (1) Central Control Station (CCS), from where the remote control/remote control of the facilities will be carried out. The DPE aims to collect all the data from the local facilities and to process them as a whole in order to manage the system • The required communication network.
https://nepps.eprocurement.gov.gr/OA_HTML/AppsLocalLogin.jsp
https://nepps.eprocurement.gov.gr/OA_HTML/AppsLocalLogin.jsp
38424000 - Measuring and control equipment
32441000 - Telemetry equipment
32440000 - Telemetry and terminal equipment
Type: quality
Description: ΣΥΜΦΩΝΑ ΜΕ ΤΑ ΟΡΙΖΟΜΕΝΑ ΣΤΗ ΔΙΑΚΗΡΥΞΗ
Weight (percentage, exact):
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.