Austria-Vienna: Firefighting equipment installation work
In the Pongau substation, a hybrid extinguishing system is planned for the protection of the 3 isolier oil-filled 380/110kV transformers and two transformer benches, also filled with isoler oil (each consisting of 3 pc single phase 380/220 kV transformers). The water supply for the extinguishing system is ensured by an above-ground and heated compressed air water boiler.
http://apg.vemap.com
45343200 - Firefighting equipment installation work
31100000 - Electric motors, generators and transformers
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.