Publications Office of the EU
L 458 Rees-Millingen, L 458 Rees-Millingen, L 458 Rees-Millingen, L 458 Rees-Millingen, L 458 Rees-Millingen, L 458 Rees-Millingen, L 458 Rees-Millingen, L 458 Rees-Millingen, L 458 Millingen, bridge over DB - EU tenders
DisplayCustomHeader
Procurement Detail Actions Portlet
OP Portal - Procurement - Details

This page contains content generated automatically to improve findability and accessibility

- indicates CPV codes deduced from the text of the procedure

- indicates text translated automatically in your browsing language

L 458 Rees-Millingen, L 458 Rees-Millingen, L 458 Rees-Millingen, L 458 Rees-Millingen, L 458 Rees-Millingen, L 458 Rees-Millingen, L 458 Rees-Millingen, L 458 Rees-Millingen, L 458 Millingen, bridge over DB Text automatically translated in your browsing language Automatically translated

  • Published
    12/02/2025
  • Deadline
    13/03/2025
  • Today
    22/03/2025
Status
Submission closed
Type of contract
Works
Subject for Renewal
No
Buyer
Landesbetrieb Straßenbau NRW - Regionalniederlassung Niederrhein
Place of performance
NUTS code: Multiple place of performance
Location of buyer
NUTS code: DEA15 Mönchengladbach, Kreisfreie Stadt
Business sector (Main CPV)
45000000 Construction work
Total estimated contract value (excluding VAT)
Not available
Total final contract value (excluding VAT)
Not available
Tender reference number
05_49-9395-B_48-24-0039
Description

In the course of the conversion and extension of the DB line 2270 Oberhausen-Emmerich state border D/NL (Betuwe line) by line 2279, the level crossing of the L 458 and the level crossing on the Bruchstraße in the village of Rees-Millingen are to be removed. As compensation, the L 458 will be redesigned and will cross the railway line with a bridge structure unevenly in height in the future. The planned structure is located in construction section 4, planning approval section 3.2 (railway km 50.7+92.4296) of the ABS measure. The number of the bridge is 4104 503. The removal of the level crossing and the new construction of the SÜ will achieve - the reorientation of traffic flows to restore traffic relations and - the maintenance of the pedestrian connection of the residential areas north and south of the railway line through a footpath and cycle path. The planned structure is a two-square road bridge, which connects the L 458 n in a curve and with a crossing angle of 64,917 gon. In the construction area, the above-mentioned currently double-track, later three-track DB line, an economic route and the two-lane connecting road of the through-separated break road with the L 458 n are submerged. The road section of the L 458 n includes two lanes and a one-sided pedestrian and cycle path. The cross-section in the building area on the south side has a widening, which allows a visual axis between the two bridge ends (holding visual range). Text automatically translated in your browsing language Automatically translated

Submission Method
Electronic via:
https://www.evergabe.nrw.de/VMPSatellite/notice/CXPNYYVDQXU
Tenders may be submitted
Electronic submission: required
https://www.evergabe.nrw.de/VMPSatellite/notice/CXPNYYVDQXU
Information about a public contract, a framework agreement or a dynamic purchasing system (DPS)
Not available
Conditions for opening tenders (date)
Not available
Place of performance
Award method
wirtschaftlichste Angebot
Estimated value
Not available
Final contracted value
Not available
Award of contract
Not available
Prior information
Contract
Award
Footnote - legal notice

This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.