"Selection of a contractor for construction of a site: "Construction of a new roundabout at the intersection of road III-502 "Polish Trambesh - Obedinenie - III-405" at km 11+516 with road III-504 "Samovodene - Obedinenie - Alekovo" Text automatically translated in your browsing language Automatically translated
The subject-matter of the contract shall include a description of the contract activities as follows: A) Construction activities – execution of construction and installation works (CMP): A1. Implementation of the construction works in accordance with the technical design of the construction, approved by the Contracting Authority, in accordance with the Technical proposal for the execution of the public procurement, the technical specifications, the prescriptions and orders in the Order Book and the approved CSC. A2. Ensure healthy and safe working conditions during construction. A3. Presentation of the ‘Temporary Organisation and Traffic Safety’ (OTS) to the Consultant in order to ensure the highest level of safety for road users. A4. Compliance with Regulation No 3 of 16 August 2010 on the temporary organisation and safety of traffic when carrying out construction and installation works on the site. A5. Submission for approval by the Consultant and the Assignor of a Linear Schedule for the execution of the construction and installation works on the site. A6. Supply and use in the construction of the necessary and compliant with the technical specifications and the technical design construction products (construction materials, including concrete mixtures, reinforcing steel, waterproofing and anti-corrosion materials, asphalt mixtures, products, elements, details, kits, etc.). A7. The Contractor is obliged to provide the Consultant with access to production facilities and plants in order to certify the quality and standard of components that cannot be checked after their use in construction. The verification of the checks at the production facilities and plants shall be documented by a protocol signed by the Consultant and the Contractor. A8. Perform the necessary tests and laboratory tests to further demonstrate the quality of the performed activities. A9.The contractor undertakes to have an accredited construction laboratory with which to carry out mandatory samples, tests of construction and installation works, in accordance with the Technical Specification 2025 of the Road Infrastructure Agency (RIA TS 2025). It's an A10. Provision of land for the needs of construction, if necessary, in accordance with the provisions of Article 38 of the Roads Act – for temporary construction, for production polygons (bases) for the needs of construction, for storage of materials and equipment and other needs in connection with the implementation of the construction, established by the Safety and Health Plan, only in cases where they are outside the territory on which the construction is being built. It's A11. Construction and maintenance of temporary weaning roads and/or temporary organization of traffic, as required by the technical specifications and restoration of the roads used during construction. A12. Relocation of underground and above-ground networks and facilities when construction is being carried out, if necessary. A13. Organizing the activities of collection, transportation, disposal and recovery of construction and other waste arising as a result of the implementation of the activities, in accordance with the requirement of the Bulgarian legislation. A14. Performing geodetic measurement of the terrain basis of the construction. A15. Implementation of horizontal road markings and vertical signalling according to the ‘Permanent traffic organisation and safety’ (PTO) project. A16. Compilation of construction papers and preparation of executive documentation for the construction. A17. In case of occurrence of Unforeseen costs during the execution of the construction proves the same with a Protocol between the Contractor, the Consultant, the GPU Sofia, the Assignor and the Designer, with attached to it a justification and documents for the need to carry them out (description of the need to produce the respective type of work, opinion of the Designer through an issued corresponding Order in the Order Book, separate bill of quantities). A18. The Contractor must prepare and submit to the Consultant, exercising construction supervision of the construction, for inspection, coordination, approval and issuance of a more positive written statement, and after its issuance by the Consultant, to enter the documents in the registry of the Assignor for approval by him as follows: A18.1. Linear schedule, within 10 days after drawing up and signing the Proto-Col. 2a for the opening of the construction site and the determination of the construction line and level, in accordance with Ordinance No 3 of 31 July 2003; A18.2. Replacement table, certified by the Consultant and the Designer, if during the construction it is found that certain quantities of a given type of work are dropped at the expense of quantities of another type of work for which there is a given one-off price in the CSC. A18.3. Unforeseen expenditure table, certified by the Consultant and the Designer and approved by the Sofia DPS, which are not provided for in the Technical Project and/or in the CCC, quantified by the Contractor, with attached to it Contingency Protocol, Technical justification and other documents for the need to carry them out (if any). A18.4. Analytical prices in the event of construction and installation works, which are not provided for in the Technical Project and for which no unit prices are given in the CCC; A18.5. Updated OBD system, in case of change during the implementation of the CDS. A19. Reporting on the progress of the construction and construction works with monthly reports, ensuring that they are completed within the specified period and the value stipulated in the contract for realization. The reports are reviewed by the Consultant, who may request a change or supplement within 7 days. It's an A20. The Contractor must draw up Certificates for the completed types of construction and installation works, then submit them for inspection and approval to the Consultant, and if errors and/or incompleteness and/or non-conformity are detected, they should be corrected. In case of errors and/or incompleteness and/or discrepancies in the Certificate by the Assignor, after it has been submitted to him for final approval, respectively for subsequent payment, which has been approved by the Consultant, a penalty may be imposed on the Consultant. Text automatically translated in your browsing language Automatically translated
https://app.eop.bg/today/528701
https://app.eop.bg/today/528701
45233120 - Road construction works
71300000 - Engineering services CVP code deduced from the text of the procedure AI-generated
71000000 - Architectural, construction, engineering and inspection services CVP code deduced from the text of the procedure AI-generated
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.