-
Published04/06/2025
-
Deadline20/06/2025
-
Today09/07/2025
Utilities
- indicates text translated automatically in your browsing language
Heating plant Längenfeld, Reengineering - Process engineering Text automatically translated in your browsing language Automatically translated
Conversion of the biomass district heating power plant Längenfeld to a biomass district heating plant.Service scope essentially:* Disassembly of existing biomass combustion including thermal oil plant (6.5 MW thermal oil boiler, thermal oil collection and expansion tank, thermal oil hydraulics and emergency cooling system)* Disassembly of the ORC plant (electric. Nominal capacity 1.1 MWel)* Construction of a new biomass combustion plant with 4 MW hot water boiler (max 110°C)* Disassembly of existing wet electric filters and construction of a dry electric filter * Renewal of the desulphurisation air preheater* Construction of a 2-stage flue gas condensation plant for heat recovery* Construction of an absorption heat pump (heating capacity approx 2.4 MW, drive with hot water 105°C)* Construction of a power-to-heat plant, 1,000 kW, 400 V* Renewal of process control technology and integration of all existing and new system components into the new higher-level process control and load management system* Update hydr. Installation rules Text automatically translated in your browsing language Automatically translated
https://tiwag.vemap.com
https://tiwag.vemap.com
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.