-
Published26/05/2025
-
Today20/06/2025
-
Deadline27/06/2025
Utilities
- indicates CPV codes deduced from the text of the procedure
St Michaels Unit Refurbishment, Mercy University Hospital
St Michael’s Unit (SMU) is a 50 bed acute admission unit for people experiencing Mental Health difficulties located on the 1st floor of the Lee View Block building, Mercy University Hospital, Cork. The unit contains single, double, and multi occupancy rooms. It is a mixed gender unit and is divided into an 18-bed acute ward and a 32-bed sub-acute ward. The facilities in SMU were designed in 2000 and do not meet the needs of a modern service. The current environment is not conducive to the recovery process. These environmental issues have been reflected in the Mental Health Commission (MHC) inspection reports over the past number of years. This projects sets out a phased refurbishment for the upgrade of anti ligature fixtures and fittings as set out in the works requirements.
https://www.etenders.gov.ie/epps/cft/viewTenders.do?resourceId=5744677
https://www.etenders.gov.ie/epps/cft/viewTenders.do?resourceId=5744677
45300000 - Building installation work
45215100 - Construction work for buildings relating to health
45215140 - Hospital facilities construction work
34000000 - Transport equipment and auxiliary products to transportation CVP code deduced from the text of the procedure AI-generated
44100000 - Construction materials and associated items CVP code deduced from the text of the procedure AI-generated
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.