Published14/08/2026
-
Today11/09/2026
-
Deadline14/09/2026
-
Opening of tenders14/09/2026
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Execution of project documentation for the project ‘Comprehensive project for adaptation of forests and forestry to climate change – prevention, prevention and mitigation of the effects of forest fire risks (FIRE2)’ - procedure No II
The subject of the contract is the execution of design documentation and cost estimation of supply to fire detectors through the construction of an underground electrical line together with obtaining the necessary arrangements and decisions and performing author's supervision over the implementation of construction works carried out on the basis of the documentation being the subject of this contract for the following tasks: 1) ‘Power supply to the Czarnowo fire detector located in Wężyska forestry with electrical installation’ under the project entitled: ‘Comprehensive project on adaptation of forests and forestry to climate change – prevention, prevention and mitigation of the effects of forest fire hazards (FIRE2)’ – Procedure code 14-02/P/01/EU/a/3-1’. 2) ‘Power supply to the Roof fire detector, located in Strużka forestry with electrical installation’ under the project entitled: ‘Comprehensive project on adaptation of forests and forestry to climate change – prevention, prevention and mitigation of the effects of forest fire hazards (FIRE2)’ – Procedure code 14-02/P/01/EU/a/3-2’. 3) ‘Implementation of the power connection to the Gronów fire detector, located in the Pław forestry with electrical installation’ under the project entitled: ‘Comprehensive project on adaptation of forests and forestry to climate change – prevention, prevention and mitigation of the effects of forest fire hazards (FIRE2)’ – Procedure code 14-02/P/01/EU/a/3-3’. A detailed description of the subject-matter of the contract is described in Annex 2 to the FTZ – Description of the subject-matter of the contract, which consists of: Annex 2.1. – Detailed description of the project tasks, Annex 2.2.1. – Situational sketch of the location of the Czarnowo Perceptible, Annex 2.2.2. – Situational sketch of the location of the Roof Perceptibles, Annex 2.2.3. – Situational sketch of the location of the Gronów Perceptibles, Annex No 2.3.1. – Network connection conditions – Czarnowo, Annex 2.3.2. – Network connection conditions – Roof, Annex 2.3.3. – Network connection conditions – Gronów, Annex 2.4. - Implementation manual for the project ‘Comprehensive project on adaptation of forests and forestry to climate change – prevention, prevention and mitigation of the effects of forest fire hazards (FIRE2)’.
https://ezamowienia.gov.pl/mp-client/search/list/ocds-148610-a712da77-dbea-4118-8baa-3f7b45ef95ff
https://ezamowienia.gov.pl/mp-client/search/list/ocds-148610-a712da77-dbea-4118-8baa-3f7b45ef95ff
71323100 - Electrical power systems design services
71320000 - Engineering design services
71248000 - Supervision of project and documentation
71242000 - Project and design preparation, estimation of costs
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.