-
Published18/09/2024
-
Deadline30/10/2024
-
Opening of tenders30/10/2024
-
Awarded17/12/2024
-
Today20/07/2025
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
AWT plant - new building merging garbage stations Text automatically translated in your browsing language Automatically translated
As part of the construction of a central waste collection point, the existing AWT plant will be extended by the connection of the new central waste collection point. For this purpose, an existing control area will be converted to a new area control during operation and supplemented by the additional routing, which includes several guide conveyors, 6 lifters, 2 turnouts, further turnstiles and switches as well as 2 roller shutters and 2 FAA. In addition, the existing control and data level must be adapted. Text automatically translated in your browsing language Automatically translated
https://www.evergabe.nrw.de/VMPSatellite/notice/CXPNYBBDG5T
https://www.evergabe.nrw.de/VMPSatellite/notice/CXPNYBBDG5T
45313100 - Lift installation work
42418940 - Container-handling equipment
42418210 - Overhead monorail equipment
45200000 - Works for complete or part construction and civil engineering work CVP code deduced from the text of the procedure AI-generated
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.