Published04/03/2025
-
Deadline07/04/2025
-
Opening of tenders07/04/2025
-
Today24/04/2025
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Design, execution of works and technical assistance by the designer during the execution of the works for the investment objective “SUPRATERAN PASSAGE OVER DN1 BAICOI AT THE INTERSECTIA BETWEEN DN1 (E60) – DJ215” Text automatically translated in your browsing language Automatically translated
The investment will have the following characteristics: − importance class – III – average (according to P 100 – 1/2013); − Importance category – “C” – normal (according to GD 776/1997). The main objective of the contract is the design and execution of works for the investment objective ‘SURRENCY PASSAGE OVER DN1 BAICOI AT THE INTERSECTIA BETWEEN DN1 (E60) – DJ215’>, in compliance with the legislation in force and the Community regulations. Currently, in the area of the intersection between DN1 and DJ215, due to the very high intensity of road traffic on the national road as well as the low capacity to ensure the fluency of road traffic, frequent bottlenecks and stagnations occur, this area representing a black point (conflict point) for the development of traffic on the two mentioned arteries. During traffic, there are major deficiencies consisting of stress, high fuel consumption, massive releases of pollutants into the atmosphere and traffic accidents. This requires the construction of a passageway for cars. The proposed location for the investment is located in the administrative area of Baicoi, at the intersection of two major traffic arteries: DN1 road, which is a European road, with 4 traffic lanes and DJ 215 which is a county road, with 2 traffic lanes. The overall objective of the project is to improve the living conditions of the population by creating safe conditions in car traffic. The specific objective to which this project refers is to improve the basic physical infrastructure in the urban space. Number of days until which clarifications can be requested before the deadline for submission of tenders/candidates: 20. Number of days until which the contracting authority responds to requests for clarifications before the deadline for submission of tenders/candidates: 11. Text automatically translated in your browsing language Automatically translated
https://www.e-licitatie.ro
https://www.e-licitatie.ro
45233120 - Road construction works
71328000 - Verification of load-bearing structure design services
71356200 - Technical assistance services
71322500 - Engineering-design services for traffic installations
45221000 - Construction work for bridges and tunnels, shafts and subways CVP code deduced from the text of the procedure AI-generated
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.