-
Published13/06/2025
-
Deadline11/07/2025
-
Today19/07/2025
Utilities
- indicates text translated automatically in your browsing language
Technical planning TGA - Extension of a changing room building Text automatically translated in your browsing language Automatically translated
The existing dilapidated, thatched, partly polluting changing room building is to be gutted or dismantled first. Subsequently, the extension and top-up will take place. Condition and equipment, also from an energy point of view, no longer correspond to the state of the art and the requirements for public buildings. A basic analysis is available and should be used for further planning. The draft floor plan for the changing room building, as set out in the Annex, is agreed with the School and Sports Office and the users. This must be taken into account in its basic features with regard to optimizations in terms of cost-effectiveness. In the extended changing area, 12 changing rooms with adjoining shower and toilet rooms are provided on two floors. In addition, two multipurpose rooms are to be built on the upper floor. The technical room and two outdoor toilet rooms are planned on the ground floor. The foundation walls of the existing building should be preserved as far as possible. Since the building is to be used for international sports operations in hockey, it is necessary to comply with the requirements of the Fédération Internationale de Hockey (FIH) when planning. Interests of the monument protection are not to be taken into account. In the existing building, heat is supplied to the building as well as hot water treatment via an oil heating system. As a result of the expansion, a solution supported as much as possible by regenerative energy sources is to be developed. For this purpose, the possibility of integrating PV for the operation of the high hot water demand and for PV surpluses must also be investigated for battery storage. The close networking between KG 420 and KG 440 is decisive for the allocation of the TGA planning to a company. Objectives for technical building equipment: - Renewal of technical installations - High energy standards - Consideration of renewable energies The planning of technical building equipment is to be carried out over the performance phases 1-9. For planning services for the extension of the changing room building of the Berlin Hockey Club at the Ernst-Reuter-Sportfeld in Onkel-Tom-Straße 40, 14169 Berlin, a suitable specialist planning office is sought. Text automatically translated in your browsing language Automatically translated
https://www.meinauftrag.rib.de
https://www.meinauftrag.rib.de
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.