-
Published24/08/2026
-
Today11/09/2026
-
Deadline29/09/2026
-
Opening of tenders30/09/2026
Utilities
- indicates text translated automatically in your browsing language
‘Designation of a contractor for the design (preparation of a technical design and a draft DDP) and construction of a site: ‘Construction of the South-East and South-West bypasses of Haskovo, from the Uzundzhovo junction at the intersection with road I-8 Haskovo-Svilengrad (inclusive) to the new Bolyarovo junction at the intersection with road III-806 Haskovo-Mineralni Bani (inclusive)’
Note: Not all information for this procedure were successfully computed. Please consult linked documents for more details.
The subject of this call for tenders is ‘Designation of a contractor for the design (preparation of a technical design and a draft DDP) and construction of a site: ‘Construction of the South-East and South-West bypasses of Haskovo, from the Uzundzhovo junction on the intersection with road I-8 Haskovo-Svilengrad (inclusive) to the new Bolyarovo junction on the intersection with road III-806 Haskovo-Mineralni Bani (inclusive)’. In this sense, the objective of the public procurement procedure was for the Road Infrastructure Agency to commission the preparation of an up-to-date, complete and coherent technical design and draft DDP, as well as the construction of a southern bypass of the town of Haskovo, consisting of the following sections, the South-East and the South-West bypass of the town of Haskovo, united in a single site and developed along the route of the variant chosen by the Expert Technical and Economic Council of the Road Infrastructure Agency at the conceptual design stage. The site should be implemented and put into operation as a single, complete facility starting from road junction ‘Uzundzhovo’ at the intersection with road I-8 ‘Haskovo – Svilengrad’ (inclusive), passing through a new road junction ‘Haskovo’, intended for the construction of the exit of the town of Haskovo in a southern direction at the intersection of the bypass road with road I-5 ‘Dimitrovgrad – Haskovo – Kardzhali’ and ending at a new road junction ‘Boliarovo’ at the intersection with road III-806 ‘Haskovo – Mineralni Bani’ (inclusive). The purpose of this contract is to provide complex, mutually related and complementary technical solutions, responsibility for the implementation of which lies with the Contractor. A project has been prepared for the site in the conceptual design phase. The technical design and construction of the section should be based on the design decisions of the preliminary design for the direct route of each of the bypass sections adopted by the Expert Technical and Economic Council (ETIS) of the RIA, as well as on the schemes of road nodes selected by the ETIS from the preliminary design. The technical design and the draft DDP should ensure the possibility of realizing the investment intention technically and on the ground. The Contractor must perform all activities to ensure the construction of the site, in accordance with the Terms of Reference for the elaboration of a technical design and a draft DDP, the Contracting Authority's requirements for the implementation of the specific site (Annex № 1 to the documentation) and the Contract for the execution of the public procurement. The tender documentation is accompanied by the conceptual solution, which is for the information of the participants in the procedure only. Errors and incompleteness in the conceptual design provided by the Assignor do not constitute its risk and cannot be grounds for claiming any additional costs on the part of the Contractor. Within the framework of the technical project, the Contractor shall examine the existing networks and facilities of the technical infrastructure falling within the scope of the development, as well as the future investment intentions for the construction of such, and shall develop projects for their protection and/or reconstruction, agreed with the respective operating company or department. On the basis of Article 137(1)(1)(a) of the Spatial Development Act, the construction is a first category. Pursuant to Article 5(1)(2) of the Rules on the procedure for entering and keeping the Central Professional Register of Builders, issued by the Bulgarian Construction Chamber, the construction is a second group: construction of transport infrastructure. Note: The technical design and the design of the DDP must be developed in accordance with the Terms of Reference for the elaboration of the technical design and the design of the DDP (Annex A to the documentation) and in accordance with the regulations and technical specifications in force! Investment Project (Draft Documentation): The investment project (Draft Documentation) and the draft DDP should be prepared in the volume and content specified in the Terms of Reference for the elaboration of a technical design and draft DDP (Annex A to the tender documentation) and in accordance with the regulations and technical specifications in force in the field of road construction. The subject of the public procurement includes a description of the activities under the contract, in accordance with the Performance Requirements - Annex № 1 to this documentation.
https://app.eop.bg/today/559257
https://app.eop.bg/today/559257
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.