LPI Saalfeld, complex refurbishment of the staff building - Technical planning Technical equipment Electrical, IT and conveyor systems Text automatically translated in your browsing language Automatically translated
Note: Not all information for this procedure were successfully computed. Please consult linked documents for more details.
For the Saalfeld State Police Inspectorate, the complex renovation of the staff building (construction year 1938) with a gross floor area of approximately 3,486 m2 or 14,855 m3 BRI and the adjacent outdoor facilities in four annual windows must be planned and carried out in the state-owned property Cottastraße 41 in 07407 Rudolstadt as part of a maintenance and repair plan. It is a two-storey L-shaped building with ground floor and upper floor in monolitic construction. The adjoining upper floor of the outbuilding is a half-timbered structure. The roof construction consists of a saddle-wall roof combination, whereby the attic of the outbuilding is extended in the existing building. Monument protection exists for the staff building and the outdoor facilities in the vicinity of the staff building, so that all structural measures must be coordinated with the monument protection authority. The scope of the construction project does not include the roof renovation and is planned as a separate measure. The measures required by the renovation measures to be planned in the building, if any, must be planned, coordinated and carried out. The results of the restoration studies, which are still to be commissioned separately, must be taken into account in the planning. Close consultations are to be conducted with the client and with the Thuringian State Office for Monument Conservation and Archaeology (TLDA). The results and stipulations of these consultations and votes shall be documented in writing. The thermal insulation certificate including the summer thermal insulation certificate according to the current building energy law (GEG) is created via the property planner. Preservation aspects will have to be taken into account in the preparation of this certificate. --- For the technical planning of technical equipment, electrical equipment (KGr 440), information technology equipment (KGr 450) and conveyor systems (KGr 460), performance level 1 with preliminary planning and design planning is initially assigned (LPH 2 and 3 HOAI 2021). The further service levels 2 to 5 with the execution planning, the preparation of the award, the participation in the award, the property monitoring and the property support (service phases 5 to 9 HOAI - as of 2021) are to be assigned in stages as an option. There is no legal claim to this. The construction measure is classified as ‘classified matter – for official use only’ (VS-NfD) and is in principle subject to the approval procedure pursuant to § 84 ThürBO 2024. The general scope of planning and services is based on the service descriptions of the HOAI. The basis and rules for the remuneration are the HOAI 2021 and the final assessed fee offer of the contractor. Text automatically translated in your browsing language Automatically translated
sen-info
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.