-
Published13/10/2025
-
Today16/11/2025
-
Deadline19/12/2025
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
ST- planning performance mechanical sludge drainage - KA Stolberg - relocation Text automatically translated in your browsing language Automatically translated
WVER operates a sewage treatment plant in Stolberg with an expansion size of 86,000 p.e. As part of this measure, the sludge dewatering including the flocculant supply is to be renovated. Currently in use is a chamber filter press, which is to be replaced by centrifuges. A new silo will also be built to store the sludge. The silo should be equipped with a loading device. Text automatically translated in your browsing language Automatically translated
https://www.vergaben-wirtschaftsregion-aachen.de/VMPSatellite/notice/CXVHYY5YTKM6P103
https://www.vergaben-wirtschaftsregion-aachen.de/VMPSatellite/notice/CXVHYY5YTKM6P103
71000000 - Architectural, construction, engineering and inspection services
45000000 - Construction work CVP code deduced from the text of the procedure AI-generated
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.