-
Published21/02/2025
-
Deadline03/03/2025
-
Opening of tenders03/03/2025
-
Awarded30/04/2025
-
Today04/07/2025
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Drainage services of treated leachate from WWTP Text automatically translated in your browsing language Automatically translated
Note: Not all information for this procedure were successfully computed. Please consult linked documents for more details.
The subject of the procurement is the removal and disposal of waste water from the Waste Water Treatment Plant (WWTP).ž By conducting regular business processes of the Client, technological waste water is generated at the Biljane Donje WMC site, which is treated at the internal waste water treatment plant (WWTP). The UPOV purifies waste water through a combination of biological treatment and ultrafiltration. Biological treatment includes denitrification and nitrification processes in the MBR reactor. Wastewater collected in the receiving basin (leachate from non-hazardous waste landfills, drainage water from mechanical biological waste treatment plants - MBT plants, potentially contaminated surface water from traffic-manipulative surfaces) is pumped into the egalization basin, which serves to equalize the inflow to the next (biological) stage of waste water treatment. Biological treatment with a nominal capacity of 90 m3/day involves a process with active sludge in which the anaerobic and anoxic phases alternate, i.e. the processes of nitrification and denitrification. After the biological degree of treatment, water is referred to ultrafiltration where sludge and other suspended particles are separated from the water. Part of the sludge is recycled into the denitrification process, and the excess is discharged into a reinforced-concrete container. The disposal of excess sludge is not the subject of this tender. Permeate (purified water obtained by ultrafiltration) is temporarily stored in a buffer tank from where it is recycled if necessary, and the rest accumulates in a tank with a volume of 630 m3 where it awaits transportation for further treatment. The water treated at the WWTP Biljane Donje is treated to the level of quality of municipal waste water suitable for discharge into the public drainage system and is intended to be transported by tanker trucks to the treatment plant of the City of Zadar (in the event of unavailability of a waste water disposal site in the area of the City of Zadar, the Client will direct the contractor to alternative locations). The cost of waste water disposal is not the cost of the contractor , and the same supplier pays directly to the operator of the treatment plant to which the waste water is removed from the WMC site. Text automatically translated in your browsing language Automatically translated
https://eojn.hr/tender-eo/37847
https://eojn.hr/tender-eo/37847
90513500 - Treatment and disposal of foul liquids
90700000 - Environmental services CVP code deduced from the text of the procedure AI-generated
90400000 - Sewage services CVP code deduced from the text of the procedure AI-generated
45000000 - Construction work CVP code deduced from the text of the procedure AI-generated
45200000 - Works for complete or part construction and civil engineering work CVP code deduced from the text of the procedure AI-generated
45252000 - Construction works for sewage treatment plants, purification plants and refuse incineration plants CVP code deduced from the text of the procedure AI-generated
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.