-
Published26/06/2025
-
Today12/07/2025
-
Deadline31/10/2025
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Pumped storage plant Grimsel 4 Construction works Lot development tunnels EGR4 Text automatically translated in your browsing language Automatically translated
The new power plant will be accessed via the Grimsel 4 (EGR4) development tunnel. The new tunnel branches off from the existing Handeck – Gerstenegg development tunnel. It is erupted in blasting and has a length of about 1.4 km. The eruption cross-section is about 28 m2. Following the development tunnels, an assembly cavern (assembled steel hydraulic engineering) with a volume of approx. 2,600 m3 (fixed) must also be erupted. Text automatically translated in your browsing language Automatically translated
tdf-non-av
45111291 - Site-development work
71000000 - Architectural, construction, engineering and inspection services CVP code deduced from the text of the procedure AI-generated
Type: quality
Description: Zuschlagskriterien
Weight (percentage, exact):
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.