-
Published23/05/2025
-
Today17/06/2025
-
Deadline01/07/2025
Utilities
- indicates text translated automatically in your browsing language
Fürst-Stirum-Klinik Bruchsal - New building building D - mobile operating table system Text automatically translated in your browsing language Automatically translated
The new building D will be built between buildings C and E. The structure has 5 storeys from the site as well as a superimposed roof control centre. On the north-west side, the building with surgical wing and technical floors in the 1st and 2nd Shot out. (drawer) The new structure connects to the crossbar of component C2 in all levels. The development of the new building D takes place on the same level via the C-connection construction, as well as via a new double elevator. The D-Bau each has a necessary staircase. The facade of the new building will be continued in the design of the existing building. The cantilevered structure receives a facade of compact panels with vertical aallulamellae as sun protection and privacy protection The levels of the new building D (E-1 to E 4 and technical structures E5) each form fire subsections / smoke sections. In sub-areas, usage units are realized. The smoke extraction of the hallways is carried out via hall windows or adjacent areas or a SHEV in the ceiling cavity. Text automatically translated in your browsing language Automatically translated
https://www.dtvp.de/Satellite/notice/CXP4YCS5S39
https://www.dtvp.de/Satellite/notice/CXP4YCS5S39
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.