-
Awarded02/07/2024
-
Today14/12/2024
Utilities
- indicates text translated automatically in your browsing language
"Fully equipped drinking/wastewater pumping stations - supply, installation, commissioning, service personnel training, integration into the SCADA application (where required) and technical revisions recommended by the manufacturer during the warranty period for electropumps" Text automatically translated in your browsing language Automatically translated
Note: Not all information for this procedure were successfully computed. Please consult linked documents for more details.
The contracting entity shall acquire: "Fully equipped drinking/wastewater pumping stations - supply, installation, commissioning, staff training, integration into the SCADA application (if required) and technical revisions recommended by the manufacturer during the warranty period for electropumps". Taking into account the specific construction variants depending on the type of water circulated, namely drinking / wastewater, the pumping stations are divided into two lots, as follows: LOT 1 – Fully equipped drinking water pumping stations (SPAPs); LOT 2 — Fully equipped sewage pumping stations (SPAUs). The composition of each batch and the technical characteristics are specified in the Specification. For each lot, a Sectoral Supply Contract will be concluded with the successful tenderer for each lot. The contracting entity in the tender documentation shall submit the proposal for a Sectoral Supply Contract. The number of days until which clarifications can be requested before the deadline for submission of tenders is 15 days. Any requests for clarifications to the tender documentation will be addressed exclusively in SEAP to the ‘Clarification Requests/Questions’ section of the contract notice. The contracting entity will only reply to requests for clarifications from economic operators by this deadline. The replies will be published in SEAP under the section ‘List of clarifications, notifications and decisions’ of the contract notice. The deadline for the contracting entity to respond to these clarifications is at least 10 days before the deadline for submission of tenders. Text automatically translated in your browsing language Automatically translated
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.