This page contains content generated automatically to improve findability and accessibility

- indicates text translated automatically in your browsing language

Ongoing repair and maintenance of shore-reinforcement facilities on the right bank after the outflow of HPP "Kozloduy" Text automatically translated in your browsing language Automatically translated

  • Published
    22/05/2025
  • Today
    21/06/2025
  • Deadline
    27/06/2025
Status
Published
Type of contract
Works
Subject for Renewal
No
Buyer
ВЕЦ КОЗЛОДУЙ ЕАД
Place of performance
NUTS code: Multiple place of performance
Location of buyer
NUTS code: BG313 Враца
Business sector (Main CPV)
45000000 Construction work
Total estimated contract value (excluding VAT)
399,197.37 BGN
Total final contract value (excluding VAT)
Not available
Tender reference number
494638
Description

The subject matter of the contract is the ongoing repair and maintenance of the shore-reinforcement facilities on the right bank of the Danube, following the outflow of HPP Kozloduy – Article 151(1)(2) in conjunction with Article 64(1)(7) ZUT. The volume of the contract includes all types of activities necessary for the execution of a retaining wall of gabions. A project has been developed containing the following parts: Geodetic part; Hydrotechnical part; Quantitative account. The project envisages, after the wing wall of the hydroelectric power plant, the construction of a retaining wall of gabions. The wall is horizontal with a length of 47.17 m, along with the anchoring part. The total height of the wall is 6.30 m. The bottom of the wall is at an elevation of 21.30 m and the ridge at an elevation of 27.60 m. A gabion with a height of 1.00 m and a width of 2.00 m is dug into the base and a factory mattress with a thickness of 30 cm is placed above it. This mattress covers the light part of the shore and reaches below the lowest level of the river. Factory gabions with a total height of 5.00 m are installed above the mattress. To ensure access, temporary roads and temporary ramps are provided for disembarking in the riverbed. The project does not change the route and technical characteristics of the currently existing coastal fortifications Text automatically translated in your browsing language Automatically translated

Submission Method
Electronic via:
https://app.eop.bg/today/494638
Tenders may be submitted
Electronic submission: required
https://app.eop.bg/today/494638
Information about a public contract, a framework agreement or a dynamic purchasing system (DPS)
Not available
Conditions for opening tenders (date)
Not available
Award method
„оптимално съотношение качество/цена”, съгласно чл. 70, ал. 2, т. 3 от ЗОП
Estimated value
399,197.37 BGN
Final contracted value
Not available
Award of contract
Not available
Prior information
Contract
Award
Footnote - legal notice

This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.