Trafoplan_GWP_Anlage_Los_354_Hoch/Tiefbau
Stadtwerke Flensburg GmbH (SWFL) operates a combined heat and power plant for generating electricity and district heating on the Batteriestraße 48 property in 24939 Flensburg. With the aim of CO2-neutral district heating generation, SWFL is planning the construction of a large heat pump system (GWP system) consisting of several heat pump modules. The brackish water of the Flensburg Fjord should serve as a heat source. In the first expansion step, a GWP plant with a heat output of 60 MWth is to be realized, which heats the district heating water from about 60 °C to up to 95 °C. The heat pump modules are installed in a building, which is to be built on a construction field in the middle of the existing structures. enco Energie- und Verfahrens-Consult GmbH (enco) takes over the general planning for the project.
https://www.subreport.de/E69854537
https://www.subreport.de/E69854537
45200000 - Works for complete or part construction and civil engineering work
42511000 - Heat-exchange units and machinery for liquefying air or other gases
71000000 - Architectural, construction, engineering and inspection services
Type: price
Description: Die Gewichtung des Preises wird in der 2. Phase bekannt gegeben.
Weight (percentage, exact):
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.