-
Published24/03/2025
-
Today24/04/2025
-
Deadline27/04/2025
Utilities
- indicates text translated automatically in your browsing language
Equipment control Hardware for wind turbines 2 Text automatically translated in your browsing language Automatically translated
DLR is building and operating the Krummendeich WiValdi wind energy research park. At this research park on the Elbe estuary, two Enercon wind turbines and a total of four flanking measuring masts have already been put into operation for research purposes. The research park will now be extended by a third modular wind turbine, the so-called OPUS 3 of the type DLR500.50. The design of this wind turbine is based on the SG500.54 small series turbine and was developed in the project ‘ExpTurb - Design of an experimental turbine’ (funding code: 0325613, project documentation (dlr.de)). In the current project "OPUS 3 – Construction of an experimental turbine" (funding code: 03EE2045), the developed design will be implemented and the OPUS 3 experimental turbine will be built, erected and commissioned. For plant control, a supplier is sought in the course of this tender for the supply of the necessary hardware and software. Further information can be found in the Terms of Reference. Text automatically translated in your browsing language Automatically translated
https://www.subreport.de/E63215637
https://www.subreport.de/E63215637
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.