-
Announced28/03/2025
-
Today19/04/2025
-
Estimated published30/04/2025
Utilities
- indicates CPV codes deduced from the text of the procedure
Purchase and Installation of Solar Power Plants
The contract involves the purchase, delivery and installation of the equipment for two solar power plant systems on the roofs of the buildings at SC “Soko” (within two locations) in Sombor. The first system, will be installed at at Venac Petra Bojovića 11 (ground lot number 7209 k.o. Sombor 1), has a capacity of 0.04 MW. The second system, will be installed at Apatinski put bb 8735/6 k.o. Sombor 1, has a capacity of 0.25 MW. The goal is to enhance green energy production in the region, align with EU and national renewable energy directives, and promote sustainability. The installation will also contribute to improving the urban environment and increasing awareness of renewable energy use.
45000000 - Construction work CVP code deduced from the text of the procedure AI-generated
45200000 - Works for complete or part construction and civil engineering work CVP code deduced from the text of the procedure AI-generated
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.