-
Published02/06/2025
-
Deadline01/07/2025
-
Opening of tenders01/07/2025
-
Today18/07/2025
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
LV 1090 - Flooring work Text automatically translated in your browsing language Automatically translated
The object of the work is the supply and installation of rubber floor coverings with skirting boards School and sports hall are positioned in such a way that they form a generous forecourt towards the west. To the existing Bannwald in the south, the Pausenhof area is being built. The sports areas are located in the rear part of the property, in the east of the building. The outline of the school building is created by two interlocking bodies. Circulating escape balconies connect both bodies to form a building. The larger, eastern part of the school building houses grades 5-10 as well as specialist classes and has two spacious, non-basement courtyards. In the eastern part of the building you can find the administrative and teacher area as well as grades 11-13. In addition to the spacious foyer, there is space on the ground floor for the slightly lowered auditorium, which is classified as a meeting place. Underneath the auditorium is the large, naturally ventilated garage with 81 parking spaces accessible from the west. To accommodate the technical facilities, the school building is partially basement. The sports hall area is also structurally connected in the basement. This part of the building is partially lowered and includes a separate entrance area, a triple gymnasium, a single gymnasium and a two-storey climbing room. Due to the lower internal height of the single gymnasium, the roof area of the 4th sub-hall is expanded as a terrace by supplementing an outdoor staircase system and made usable as a lounge area and grandstand. A PV system will be installed on the green roof areas of the triple gymnasium and the school building. The school building is built in the UG as a reinforced concrete solid construction and from the EC in hybrid construction, as a reinforced concrete skeleton construction, folded out with solid wooden wall elements. Wood-concrete composite ceilings, consisting of cross-stacked timber elements and reinforced concrete, are mainly used as ceiling components. The underside of the wooden elements receives an acoustic milling and remains visible later. The triple gymnasium is built in solid construction. The ceiling structure consists of BSH double frames with acoustic trapezoidal sheet formwork. The single gymnasium is built in pure reinforced concrete solid construction. Since this is a major construction project with a large number of different trades, the execution period for these works can be extended by up to 6 months due to circumstances that cannot be planned in advance by the client (e.g. special weather conditions, delays in the release of plans / statics, delays / insolvency of pre-contractors). For an extension of the construction time by 20 % of the estimated construction time for the trade, but a maximum of 6 months, this does not lead to additional claims for remuneration by the contractor. Text automatically translated in your browsing language Automatically translated
https://plattform.aumass.de/Veroeffentlichung/av258d02-eu
https://plattform.aumass.de/Veroeffentlichung/av258d02-eu
45432130 - Floor-covering work
45432100 - Floor laying and covering work
45432111 - Laying work of flexible floor coverings
45432000 - Floor-laying and covering, wall-covering and wall-papering work
45430000 - Floor and wall covering work
45200000 - Works for complete or part construction and civil engineering work CVP code deduced from the text of the procedure AI-generated
Type: price
Description: Die Gewichtung der Angebote erfolgt zu 100% nach Preis. Der Preis ist das alleinige Zuschlagskriterium.
Weight (percentage, exact): 100
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.