-
Awarded27/11/2024
-
Today20/07/2025
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Framework contract for architectural and engineering services for technical equipment Text automatically translated in your browsing language Automatically translated
Architectural and engineering services for technical equipment in accordance with § 55 HOAI in conjunction with Annex 15 - Heating/ventilation/ plumbing/electrical - Performance phase 1-9 The individual projects are usually commissioned in the following project stages or partial services from them: 1st stage: Performance phase 1-7 of the HOAI as well as pro rata basic and special services. 2nd stage: Performance phase 8 of the HOAI as well as pro rata basic and special services. 3rd stage: Service phase 9 of the HOAI as well as pro rata basic and special services (including monitoring the rectification of defects within the limitation period). Additional services (optional): - Participation in the technical support of tenants before and during the construction project. - Contribute to the modernisation announcement and settlement. - Inventory analysis of heat networks for the preparation of decarbonisation plans within the framework of the Heat Planning Act. Within the framework of the construction plan valid in the current year, individual building services, such as heating stations, pressure holding systems, hot water heating systems, heating systems, sanitary ducts, ventilation and air conditioning systems, electrical installations (e.g. risers, house alarm and bell systems, lighting systems) are to be repaired on a large number of buildings. The repair work must be carried out, including all ancillary work (in the case of continuous renovation including restoration of the kitchen/bathroom areas). 30 individual construction measures are assumed per construction plan year. The framework contract partners (number 3-6) are selected through the evaluation of the fee offers as well as through a negotiation with a presentation. The presentation to be prepared should explain in detail the planning and implementation of a comparable measure, such as a continuous renovation in an apartment building. Particular attention is paid to the selection of the technically necessary measures with regard to operating and refurbishment costs as well as considerations of sustainability, selection of funding, handling of pollutants and handling of construction supervision, cost control, disruptions and adherence to deadlines. Communication with the client should be another aspect of the presentation. As far as possible, the allocation of the individual projects after the award of the contract to the framework contract partners takes place evenly among all framework contract partners with the emergence of the respective needs. The contractor must be able to work on several projects in parallel, as work on several projects can start at the same time during the contract period. The response time from the call-up of the services to the start of planning must be made within 14 days. Text automatically translated in your browsing language Automatically translated
71300000 - Engineering services
71200000 - Architectural and related services
71350000 - Engineering-related scientific and technical services CVP code deduced from the text of the procedure AI-generated
Postal address:
Town: Berlin
Postal code: 10787
Country:
Official name: GNEISE Planungs- und Beratungsgesellschaft mbH
Postal address:
Town: Berlin
Postal code: 12437
Country:
Official name: Architekturwerk Gesellschaft von Architekten mbH
Postal address:
Town: Berlin
Postal code: 10783
Country:
Official name: GPlant Architekten und Ingenieure GmbH
Postal address:
Town: Berlin
Postal code: 13599
Country:
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.