-
Today17/07/2025
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Supply, installation and movement of methane monitoring equipment Text automatically translated in your browsing language Automatically translated
The market consultation concerns the supply, installation and movement of methane gas, temperature and flow measurement equipment. The equipment is placed at several measuring points at different sewage treatment plants. This concerns equipment that is moved to a different location every time after about 4 weeks, so that measurements can be taken at several measuring points at different sewage treatment plants. Text automatically translated in your browsing language Automatically translated
38300000 - Measuring instruments
38430000 - Detection and analysis apparatus
45200000 - Works for complete or part construction and civil engineering work CVP code deduced from the text of the procedure AI-generated
45000000 - Construction work CVP code deduced from the text of the procedure AI-generated
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.