Published01/07/2026
-
Deadline03/08/2026
-
Today11/08/2026
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
The supply of cooling towers with a total cooling capacity of 25 MW, 2. Construction phase.
The client intends to build the 2. Construction phase of a district cooling centre in an existing building at the HKW Süd site in order to supply a district cooling network. This procurement covers cooling towers that ensure the recooling of waste heat from the compression and absorption chillers. The cooling towers are to be designed as hybrid cooling towers. The cooling towers must be designed in such a way that they can be positioned on a predetermined roof surface. The total cooling capacity is 25 MW. The cooling water must be cooled from 37°C to 27°C. Part of the scope of supply and services is the associated automatic slurry, water conditioning with biocide dosing, the insertion of the cooling towers by means of cranes (incl. crane position), the cabling of the cooling towers with the control cabinets (incl. control cabinet and cable tray construction) and the execution of a suitable cooling tower substructure.
https://www.swm.de/einkauf/lieferantenportal
https://www.swm.de/einkauf/lieferantenportal
Type: cost
Description: Wird in den Ausschreibungsunterlagen bekanntgegeben.
Weight (percentage, exact):
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.