-
Published13/11/2023
-
Deadline07/12/2023
-
Opening of tenders07/12/2023
-
Today26/09/2026
Utilities
- indicates text translated automatically in your browsing language
BLB D/Düsseldorf/HHU/ABV 23.xx/VE 404.3 Electrical installations 065-23-00360
At the Heinrich-Heine University of Düsseldorf, all medies need to be decoupled in order to rehabilitate the building 23.11/12. The work required in and on buildings 23.11/12 and 23.01, 23.02, 23.03 and 23.40 is summarised below: — approx. 1 730 m Disassembly/disassembly of NYCWY 4x10/10 to NYCWY 4x185/95 mm² – approx. 2 364 m disassembly/disassembly of lines up to 3x2.5 mm² – approx. 1 250 m dismantling/disassembly of ring lines – Interconnection/disconnection of medium-voltage installations approx. 2 040 m N2XSEY 6/10kV 3x70/16 – Approx. 227 m cable platform 300 mm – 400 mm with disconnection pitch – connection + deactivation of station control technology to the interim NNS HV connection to the NSHV in building 23.11/12 after core refurbishment – approx. 970 m NYCWY 4x10/10 to NYCWY 4x240/120 mm² – approx. 3 720 m fibre (earth cables) 12 fibres SM/MM – approx. 3 985 m LWL line (12-96 fibres SM/MM) – 22 pc. Patch panel Cat.3/12/48 fibres
https://evergabe.blb.nrw.de/Vergabe/notice/CXS7YYXY109EED5K
https://evergabe.blb.nrw.de/Vergabe/notice/CXS7YYXY109EED5K
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.