-
Announced27/07/2026
-
Today18/08/2026
Utilities
- indicates text translated automatically in your browsing language
Implementation of new aisles of the data room in the MHMP data centre
The subject of the above-threshold public contract awarded in an open procedure is the implementation of new RACK aisles in the DS22 data room in the DC05 Chodovec data center. As part of the contract, 42 RACKs will be built in two closed aisles, including a monitoring PDU with 14 cooling units in an ideal location for optimal cooling. - 3 RACKs for installation of optical cables and 3 RACKs for Data libraries. - Complete wiring of two power branches, including reinforcement of supply cables and switchboards with protection for individual RACKs. - Complete cooling connection, including modification of existing wiring. - Modified extinguishing distribution to meet the needs of new aisles. - Cable trough system for the management and organization of data cables. The premises of the new aisle will be technologically identical to the closed aisles realized in the existing DC5 data room. The subject of the delivery is also the construction of a complete management system of low-voltage and data cabling in the area of the data hall. All the above technologies will be installed, put into operation, tested and put into production according to the requirements of the Contracting Authority specified in the tender documentation. As an output, the technical documentation will be processed.
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.