-
Published23/05/2025
-
Today23/06/2025
-
Deadline25/06/2025
Utilities
- indicates text translated automatically in your browsing language
BKP224 Spengler & flat roof work, Stansstad plant building Text automatically translated in your browsing language Automatically translated
Note: Not all information for this procedure were successfully computed. Please consult linked documents for more details.
The station building at Bahnhofstrasse 21 in Stansstad is getting old. A significant part of the building components has exceeded their technical lifetime. The premises of the internal uses – in particular the control centre – no longer meet today’s requirements. The cloakroom situation of the locomotive staff is also suboptimal. A fundamental optimization is no longer possible in the existing building fabric. The newly built company building at Bahnhofstrasse 25 is a replacement for the existing control centre at Bahnhofstrasse 21. The control system is currently at this location. The newly created operating centre can connect to the existing technical components (line cables). In the new building on the northwest side of the existing company building on the Bhf21, new contemporary premises for the affected internal uses are therefore to be created. In essence, a replacement new construction of the control center building, which mainly serves the construction and operation of the railway, is planned. The connection to the existing building is via a passerelle. The majority of the building is used by the Infra. On the meeting floor, the crisis room can also be used as a meeting room, with partitions this can be won an additional room. The traffic pays a cost rent for the use. On the ground floor, a sales area is intended as a high-yield third-party use as a replacement for the kiosk at the Bhf21. In this case, the cost rent is demanded in the minimum. After moving into the new building at the end of 2026, the Bahnhofstrasse 21 building will remain intact for the time being and will be transferred to a new use by third parties as an interim use until the railway or real estate development of the area. Text automatically translated in your browsing language Automatically translated
https://www.simap.ch/de/redirect?context=eyJwYWdlIjoicHJvamVjdCIsInJvbGUiOm51bGwsIm9yZ0lkIjpudWxsLCJwcm9qZWN0SWQiOiI3Y2UzNzU0Ny04Nzg4LTRhZDYtOTliZS0zZjg5NzI2MTk4NzgiLCJsb3RJZCI6bnVsbCwic3Vic2NyaXB0aW9uSWQiOm51bGx9
https://www.simap.ch/de/redirect?context=eyJwYWdlIjoicHJvamVjdCIsInJvbGUiOm51bGwsIm9yZ0lkIjpudWxsLCJwcm9qZWN0SWQiOiI3Y2UzNzU0Ny04Nzg4LTRhZDYtOTliZS0zZjg5NzI2MTk4NzgiLCJsb3RJZCI6bnVsbCwic3Vic2NyaXB0aW9uSWQiOm51bGx9
Type: quality
Description: Zuschlagskriterien
Weight (percentage, exact):
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.