-
Awarded30/05/2025
-
Today20/06/2025
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Rehabilitation of the railway line Brasov-Simeria, component of the Rhine-Danube Corridor, for traffic with a maximum speed of 160 km/h, Brasov-Sighisoara section, subsections :1. Brasov - Apata and 3.Cata- Sighisoara Text automatically translated in your browsing language Automatically translated
Rehabilitation of the railway line Brasov-Simeria, component of the Rhine-Danube Corridor, for traffic with a maximum speed of 160 km/h, Brasov-Sighisoara section, subsections :1. Brasov - Apata and 3.Cata- Sighisoara The main objective of the rehabilitation works is the circulation of passenger trains with a maximum speed of 160 km/h and freight trains with a maximum speed of 120 km/h. The Brasov - Sighisoara section is divided into 3 subsections, of which only subsections 1 and 3 are subject to this tender: Subsection 1. Cap X Brasov – Apata CapY (km 170+285,000 - km 208+088,954) Subsection 2. Apata CapY- Cap X Cata (km 208+088,954 - km 236+157,940) Subsection 3. Cap X Cata – Sighisoara Cap Y (km 236+157,940 - km 282+842) On the two subsections put up for auction, there are currently 11 sectioning points, all electrodynamically centralised (CED): 4 c.f. stations, 7 movement stops, 8 commercial stops and halts. There are two main railway nodes on the route and a double tunnel 660 m long. The project for the rehabilitation of the Brasov-Apata and Cata-Sighisoara subsections covers the following categories of works: earthworks C.F lines, reinforcements, superstructure, bridges and viaducts, bridges, tunnels, overpasses, roads, environmental protection, contact line, plant protection, power supply, telecommunications, fiber optics, passenger information system, signalling communications, video surveillance, architecture, resistance, electrical installations, sanitary installations, thermoventilation installations, bank defences, signalling, rail traffic. The technical project includes specifications, technical memos, drawings, lists of quantities and will be published in SEAP so that all possible bidders have access to the information needed to prepare the tender. The period of execution of the works is 48 months plus 60 months period of notification of defects. Text automatically translated in your browsing language Automatically translated
45221000 - Construction work for bridges and tunnels, shafts and subways
45234115 - Railway signalling works
45315300 - Electricity supply installations
45213321 - Railway station construction work
45234100 - Railway construction works
45233000 - Construction, foundation and surface works for highways, roads CVP code deduced from the text of the procedure AI-generated
71000000 - Architectural, construction, engineering and inspection services CVP code deduced from the text of the procedure AI-generated
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.