Rehabilitation of the Brasov-Simeria railway line, component of the Rhine-Danube Corridor, for traffic with a maximum speed of 160 km/h, Brasov-Sighisoara section, subsections :1. Brasov -Apata and 3.Cata- Sighisoara
Rehabilitation of the Brasov-Simeria railway line, component of the Rhine-Danube Corridor, for traffic with a maximum speed of 160 km/h, Brasov-Sighisoara section, subsections :1. Brasov-Apata and 3.Cata- Sighisoara The main objective of the rehabilitation works is the circulation of passenger trains with a maximum speed of 160 km/h and freight trains with a maximum speed of 120 km/h. The Brasov-Sighisoara section is divided into 3 subsections, of which only subsections 1 and 3 are subject to this tender: Subsection 1. Cap X Brasov – Apata CapY (km 170+285,000 - km 208+088,954) Subsection 2. Apata CapY- Cap X Cata (km 208+088,954 - km 236+157,940) Subsection 3. Cap X Cata – Sighișoara Cap Y (km 236+157,940 - km 282+842) On the two subsections put up for auction, there are currently 11 cut-off points, all electrodynamically centralised (CED): 4 c.f. stations, 7 movement stops, 8 commercial stops and stops. There are 2 main railway knots along the route and a double tunnel 660 m long. The rehabilitation project for the Brasov-Apata and Cata-Sighisoara subsections covers the following categories of works: earthworks C.F. lines, reinforcements, superstructure, bridges and viaducts, bridges, tunnels, overpasses, roads, environmental protection, contact line, protection of installations, power supply, telecommunications, fiber optics, passenger information system, signaling communications, video surveillance, architecture, resistance, electrical installations, sanitary installations, thermoventilation installations, bank defenses, signalling, rail traffic. The technical project includes specifications, technical memos, drawings, lists of quantities and will be published in SEAP so that all possible bidders have access to the information needed to prepare the offer. The period of execution of the works is 48 months plus 60 months the period of notification of defects.
45221000 - Construction work for bridges and tunnels, shafts and subways
45234115 - Railway signalling works
45315300 - Electricity supply installations
45213321 - Railway station construction work
45234100 - Railway construction works
45233000 - Construction, foundation and surface works for highways, roads
71000000 - Architectural, construction, engineering and inspection services
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.