-
Awarded29/10/2024
-
Today08/11/2025
Utilities
- indicates text translated automatically in your browsing language
City of Polch - Planning services for the construction project Sportpark Polch: Lot 4 - Structural design services Text automatically translated in your browsing language Automatically translated
The City of Polch is planning the construction of a wide-ranging sports facility, including a clubhouse, within the scope of the development plan "Umfeld Forum Polch" in the eastern part of the City of Polch, which is currently shortly before the decision is taken. The area is located in the immediate vicinity of the Maifeldstadion. A large playing field, 3 tennis courts, a functional building including a clubhouse, a cage soccer small playing field, a pump track and a beach volleyball field are to be rebuilt. An existing jogging path is partially preserved. The extension of the jogging path or an alternative route including lighting will be further planned. Other existing facilities immediately to the east of the Maifeldstadion - small field with long jump and shot put - are also to be preserved and examined and further planned with regard to possible renovation measures. The client commissioned a feasibility study in advance. The feasibility study is part of the procurement documents. The estimated cost of the action is as follows: 1. Grand playing field 840.775 EUR 2. Tennis courts 234,448 EUR 3. Functional building 800.000 EUR 4. Cage-Soccer-Kleinspielfeld 106.050 EUR 5. Pumptrack 154,400 EUR 6. Beach volleyball field 57,600 EUR 7. Jogging path 33,511 EUR 8. Small game field 55.000 EUR 9. Parking spaces 161.820 EUR As part of the open-air planning, the necessary technical equipment, e.g. sewage, irrigation and lighting systems, as well as all parking spaces, plantings, etc. required under building law, must be manufactured. If possible, the surface water should be fed to seepage on site. In order to prove the infiltration capability, a geological report is obtained separately. The project is carried out within the framework of the state sports funding programme "Support for the construction of sports facilities". The contractor must support the client in preparing a funding application and provide the necessary information and documents. The planning that can be approved shall be submitted by November 2024. Construction is expected to begin in the first half of 2025. Construction is expected to take place by the end of 2026. With regard to the service description, the client is guided by the HOAI 2021. More details are set out in the contract. Text automatically translated in your browsing language Automatically translated
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.