ESTW Eidelstedt construction work for WHZ, NEA, NSHV, cable laying and AP - EU tenders
DisplayCustomHeader
Procurement Detail Actions Portlet
OP Portal - Procurement - Details

This page contains content generated automatically to improve findability and accessibility

- indicates CPV codes deduced from the text of the procedure

- indicates text translated automatically in your browsing language

ESTW Eidelstedt construction work for WHZ, NEA, NSHV, cable laying and AP

  • Canceled
    07/12/2023
  • Today
    18/08/2026
Status
Canceled
Type of contract
Works
Subject for Renewal
No
Buyer
DB Netz AG (Bukr 16)
Place of performance
NUTS code: Multiple place of performance
Location of buyer
NUTS code: DE712 Frankfurt am Main, Kreisfreie Stadt
Business sector (Main CPV)
45311200 Electrical fitting work
Total estimated contract value (excluding VAT)
Not available
Total final contract value (excluding VAT)
The procedure is closed
Number of lots
3
Tender reference number
23FEI67162
Description

By removing the local occupation of the old stations, it is no longer possible to ensure the functionality of the switches in winter. Accordingly, a new switch-gear heating system must be installed in the non-heating areas. In the Bf. Pinneberg has to split the existing switch heating system 1 into S-Bahn and long-distance railways. To this end, a new switch heating system 3 is being planned for the long-distance railway in close proximity to the existing switch heating system 1. DB Energie will set up a new Trafostation next to the ‘Ef’ signal. The low-voltage installation of the interlocking system is supplied from the Trafostation. Due to the change in the form of the network of the NSHV DB Netz and the LST power supply, it is necessary to renew the sub-distribution of the building technology. For the emergency power supply of the ESTW, a power supply from the overhead contact line shall be installed in accordance with Ril 819.0902. For the power supply of the new ESTW-A Pinneberg, a new meter connection column (ZAS) DSO-DB energy will be installed and fed by the local supply system operator (DSO) taking into account the energy supply concept. The EEA/50Hz works in the ESTW Eidelstedt extension project are to be carried out in the Eidelstedt and Pinneberg areas under three lots. Lot 1 includes works relating to NSHV, NEA and building distributions in the Pinneberg area. In Lot 2, two switch heating systems in the Eidelstedt area will be rebuilt and other WHZ systems will be adapted. Lot 3 will take place in the Pinneberg area. Part of this lot is the power supply to the ESTW-A, a WHZ and the power supply HOA.

Submission Method
Not available
Tenders may be submitted
Not available
Information about a public contract, a framework agreement or a dynamic purchasing system (DPS)
Not available
Conditions for opening tenders (date)
Not available
Place of performance
Prior information
Contract
Award
Footnote - legal notice

This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.