-
Published18/06/2013
-
Deadline02/08/2013
-
Today15/07/2026
Utilities
- indicates text translated automatically in your browsing language
CH-Zurich: Construction work
Object 20, SUE Sandacher; The bridge dating from 1970 is a prestressed concrete construction allowing motorised traffic (2 lanes) and not motorised for crossing the national road N1, the Limmattal marshalling station and the full lane between Dietikon and Killwangen.It has a total length of approx. 378 m and a width of 11.05 m.
Object 20a, Pa Zinggacher; This bridge, built in 1969/1970, has a total length of approx. 286 m and a width of 4.5 m. This passive reinforcement construction allows non-motorised traffic to cross the national road N1, the Limmattal marshalling station and the full track from Dietikon to Killwangen.
Rehabilitation of the structures – after an operating period of more than 40 years, the 2 structures of art SUE Sandacher and Pa Zinggacher must be completely renovated. In addition to repairing the concrete of the load-bearing structure, the bridge equipment must also be replaced or restored.
MetrésSUe Sandacher Deamination of the coating, 3 700 m² Concretion of concrete, 2 200 m² reprofiling, 2 200 m² Bridge ducting, 800 m Coating (MA), 950 t waterproofing, 3 700 m² Safety guard/slides, 820 m pavement joints, 23 m Pa Zinggacher Coating boiling, 1 100 m² Concrease up to 60 mm, 540 m² reprofiling up to 60 mm, 540 m² Surface (MA), 200 t waterproofing, 1 100 m² bodyguard, 620 m ground joints, 10 m.
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.