-
Published26/11/2024
-
Today05/12/2024
-
Deadline02/01/2025
-
Opening of tenders02/01/2025
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Scientific and technical advice on the implementation of the T-2 road tunnel and landslide protection as part of the task: ‘Design and construction of the S19 expressway between Jawornik and Lutcza, approx. 5,25 km’ Text automatically translated in your browsing language Automatically translated
The subject of the contract is scientific and technical advice on the implementation of the T-2 road tunnel and the protection of landslides as part of the task: ‘Design and construction of the S19 expressway between Jawornik and Lutcza, approx. 5.25 km’. The service includes scientific and technical advice, also known as scientific supervision, during the design and implementation of works in the field of the T-2 tunnel and landslide protection on the section S19 Jawornik – Lutcza, with a length of approximately 5.25 km, in particular: 1. Verification of design solutions developed by the Contractor in the scope of the Construction Project in terms of their legitimacy and admissibility, taking into account legal and contractual formal requirements and the best currently available technical knowledge (concluded with the issue of the Scientific Supervision Post). 2. Verification of design solutions developed by the Contractor in the field of Executive/Technological/Technical Projects in terms of their validity and admissibility, taking into account legal and contractual formal requirements and the best currently available technical knowledge, including, among others, an addition to the geological and engineering documentation [including the probability of occurrence of gases in the massif (gas type, gas pressure, contact zones)] and hydrogeological, mining plant traffic plan and rescue action plan (concluded with the issue of the Scientific Supervision Position). 3. Scientific supervision opinion in the form of technological - structural and technological assessment of issues arising at the stage of drilling the T-2 road tunnel, transverse passages and securing tunnel portals or landslides, verification of the technologies and materials used, copyright supervision cards. 4. Verification of assumptions for calculations and calculations of works carried out by the Contractor in the scope of landslide protection projects and landslide predisposed at the stage of the Construction Project, together with verification of the monitoring project (surface and deep) of landslides and landslide predisposed (concluded with the issue of the Scientific Supervision Post). 5. Verification of assumptions for calculations and calculations of works carried out by the Contractor in the scope of landslide protection projects and landslide predisposed at the stage of the Executive Project (completed with the issue of the Scientific Supervision Post). 6. Verification of design solutions developed by the Contractor at the stage of the Construction Project in the field of tunnel equipment and its infrastructure and Tunnel Safety Documentation, in terms of, among others, correctness, safety, reasonableness and admissibility of, among others, assumptions, calculations, analyses, simulations and technologies, taking into account legal and contractual formal requirements, SWZ and the best currently available technical knowledge (completed with the issue of an unambiguous Scientific Supervision Position); 7. Verification of design solutions developed by the Contractor at the stage of the Executive Project (PW) in the field of tunnel equipment and its infrastructure, Tunnel Safety Documentation and during the execution of works, in terms of, among others, correctness, safety, legitimacy and admissibility of, among others, assumptions, calculations, analyses, simulations and technologies, taking into account legal and contractual formal requirements, CVT and the best currently available technical knowledge (finalized with the issue of an unambiguous Position of scientific supervision); 8. Verification of the monitoring projects/programmes developed by the Contractor at the stage of preparatory work, drilling and tunnel operation (construction, initial and final housing, portals and transverse passages), landslides, monitoring system implementation projects (finalised with the release of the Scientific Supervision Post). 9. Analysis of the parameters of the rock mass at the stage of design works and during tunnel drilling, with the possibility of hydrocarbons (e.g. methane) ending with the issue of a scientific supervision post; 10. Verification and analysis of the working parameters of the TBM disc during drilling, completed with the issue of the Scientific supervision position; 11. Assessment of problems arising at the design and construction stage of the T-2 road tunnel and securing landslides resulting from the Contractor's claims, proposals for change or issued change orders, failures on the construction site together with a proposal for their solution/indication of solutions allowing for rational decisions to be taken by the Consultant and the Ordering Party (finalized with the issue of an Expertise). 12. Participation as part of the Stay on the contract of the Chief Expert on Scientific Supervision of the Republic of Poland. Tunnel or members of the Scientific Expert Panel designated by him/her, relevant to the discussed topics in working meetings, Construction Councils, Technical Councils, ZOPI meeting. Meetings may take place at the design and implementation stage in the Engineer's Office, the Works Contractor's Office, on the Construction Square, at the headquarters of the GDDKiA Branch in Rzeszów or at the offices of administrative bodies competent in matters of preparation and implementation of the investment or in the form of videoconferences. The value of the contract exceeds EUR 143 000. The Ordering Party reserves the obligation to personally perform by the Contractor the key services described in item. 1, 2, 4 and 5 TER. Text automatically translated in your browsing language Automatically translated
https://gddkia.eb2b.com.pl
https://gddkia.eb2b.com.pl
71310000 - Consultative engineering and construction services
71247000 - Supervision of building work
71248000 - Supervision of project and documentation
71500000 - Construction-related services CVP code deduced from the text of the procedure AI-generated
Type: price
Description: Waga kryterium wynosi 60%
Weight (percentage, exact):
Criterion:
Type: quality
Description: Waga kryterium wynosi 20% Nazwa kryterium: Doświadczenie Głównego Eksperta Nadzoru Naukowego ds. Tunelu (GENN)
Weight (percentage, exact):
Criterion:
Type: quality
Description: Waga kryterium wynosi 10% Nazwa kryterium: Doświadczenie Eksperta Naukowego ds. konstrukcji i technologii budowy tunelu (EN K) wykonywanego metodą górniczą bądź tarczą TBM
Weight (percentage, exact):
Criterion:
Type: quality
Description: Waga kryterium wynosi 10% Nazwa kryterium: Doświadczenie Eksperta Naukowego ds. wentylacji (EN W)
Weight (percentage, exact):
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.