-
Published15/12/2023
-
Deadline17/01/2024
-
Opening of tenders17/01/2024
-
Today07/08/2026
Utilities
- indicates text translated automatically in your browsing language
Kha – Kombibad Hirschbach Aalen
— 3-storey swimming pool new construction with UG, EG and OG, built into the slope – the present LV includes dry-building walls and – Dry building walls and – Dry building walls: 20 m² F30 Metal stand wall WD 175 mm cement pile 97 m² WD metal stand wall 175 mm cement builder. 15 m² WD metal stand wall 125 mm cement builder. 7 m² F30 WD double stand wall WD 225 mm cement plenum. Total quantity: 139 m² overlays/walls: 50 m² F30 WD shaft wall 100 mm cement pile. Total quantity: 50 m² dry-build ceilings: 133 m² lower ceiling cement plaster, single layer D 12.5 mm 95 m² under ceiling plaster plaster. H2 single layer D 12.5 mm Total quantity: 228 m²
https://www.subreport.de/E28294456
https://www.subreport.de/E28294456
Type: price
Description:
Weight (percentage, exact):
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.