Published27/06/2025
-
Today16/07/2025
-
Deadline01/08/2025
-
Opening of tenders01/08/2025
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Construction of temporary snow-reception area in Malmi, total contract Text automatically translated in your browsing language Automatically translated
The contract includes the construction of a temporary snow-reception area in Malmi to the extent indicated in the contract documents. The construction project includes, for example, the stabilization of the ground reinforcement of a temporary snow-reception area, construction and the construction of soothers in its vicinity. The contract also includes the construction work required for the gates and electric cables to be built at the new runway from Suurmetsäntie to the old runway, to the extent required for the connection of the structures. The contract includes the construction of a temporary left-turning lane on Suumetsäntie for the snow reception area. The alignment of the driveway on Suurmetsäntie will be changed and the pedestrian and cycling route will be repaved. The developer is the General Areas service of the City of Helsinki's Urban Environment Division, which also acts as a subscriber in accordance with YSE 98. Works in accordance with the contract documents must be completed and received, and the inspections required by the authorities and the inspection bodies must have been satisfactorily held on 30 September 2026. The form of the contract is a total contract in which the contractor selected for the work acts as the main contractor within the meaning of YSE and Finnish legislation. The contractor is responsible for site management duties and site services. In addition to the works according to the plans mentioned in the list of documents, the contract includes site management duties and site services, which also apply to the separate contracts in section 1.8 and the separate procurements of the developer in section 3.4 and the procurement limits set out in the contract limits appendix. The work is carried out as a total price contract. The site will be fully implemented as a low-emission construction site, the requirements of which can be found in section 4.2 of the Work Limits Annex. The amounts indicated in the plans are not binding on the subscriber. The contract will be awarded to the tenderer offering the most economically advantageous tender. The most economically advantageous tender shall be the lowest priced tender meeting the tenderer's suitability requirements set by the developer. The subcontractor/subcontractor of a contractor with a contractual relationship with the client has the right to subcontract/subcontract the work. The chaining of the procurement/contract beyond this is not possible without a particularly justified reason and the written consent of the client/builder must be obtained. Text automatically translated in your browsing language Automatically translated
https://tarjouspalvelu.fi/helsinki?id=566930&tpk=08b5a507-bd89-4dae-a5db-82bc1428bf47
https://tarjouspalvelu.fi/helsinki?id=566930&tpk=08b5a507-bd89-4dae-a5db-82bc1428bf47
45200000 - Works for complete or part construction and civil engineering work
45230000 - Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork CVP code deduced from the text of the procedure AI-generated
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.