-
Today19/05/2026
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Pipeline, pipe bridge, insulation and equipment installation contract, Kokkolan Energia
The subject of the procurement is provisionally described in Annex 35014-8000-1001_Procurement programme_ Pipework. The appendices mentioned in the procurement programme are not available at this stage. Preliminary technical specification of piping and steel structures: - The preliminary total length of the piping is 1500m - Materials to be used: - P235GH - 1.4307 - 1.4432 - 1.4462 - 16Mo3 - P250GH - P265GH - Pipe sizes DN15-DN600 - PED categories: SEP, I, II,III - The content is HÖYRY/VESI - Maximum design pressure is 60 bar(g) - Maximum design temperature is 253°C - Total mass of steel structures in the pipe bridge 10500 kg
45330000 - Plumbing and sanitary works
45262400 - Structural steel erection work
44167000 - Various pipe fittings
71300000 - Engineering services
71000000 - Architectural, construction, engineering and inspection services
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.