Awarded20/08/2024
-
Today29/04/2025
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Construction of Stryków Development Centre (CRS) Text automatically translated in your browsing language Automatically translated
The subject of the contract includes the construction of the Stryków Development Centre. The CRS Investment consists of a number of elements, but the main part of the complex is a complex of buildings: -Basic School, -Preschools, -Sports Hall, -House of Culture with a connector The whole team is complemented by the sports part of the land development located in the north-eastern part of the property, consisting of: -athletics court, -outdoor stadium serving both above-mentioned pitches, -cloakroom and sanitary facilities building, -volleyball and basketball courts, -playgrounds located directly next to kindergarten and school classes. The school fence divides the area into three zones – public, school and sports. From the front and northern elevation, i.e. in the public part, the fence is not designed. The area will be illuminated by artificial light, designed lighting fixtures. In the area covered by the study, external benches and bicycle racks were also designed. The whole is complemented by greenery management - it is planned to plant alley and solitary trees and low greenery (shrubs, cover plants). 2.Investment area: Unit Nos 108/2, 108/3, 109/2, 109/3, 110/1, 110/2, 111/1, 111/2, 111/3, 112/1, 112/2, 112/3, 113/1, 113/2, 113/3, 114/1, 114/2, 114/3, 115/1, 115/2, 115/3,116/1, 116/2, 116/3, 117/1, 117/2, 117/3, 118, 119, 120/1, 120/2, 120/3, 121, 122, 124/1, 125/1, 126/1, 126/3, 123 district Stryków 3, with an area of 9.5092 ha, located in the area of Warszawska, Szafera, Zakładowa streets, is currently undeveloped and undeveloped. 3.In the first stage covered by the contract, the raw materials of the buildings of the kindergarten, school, sports hall and community centre as well as turnkey football and athletics pitches (including stands, facilities and infrastructure) and access roads to the pitches together with the necessary underground and ground infrastructure (roads, installations and networks) will be constructed, enabling at this stage to obtain a permit to use the pitches and their use without any need to interfere with the elements made during the implementation of the Option Law. In the sanitary installation industry, Stage 1 includes in particular: - water supply network, water supply connection and on-site installation - sanitary sewerage connection, on-site installation - rainwater sewerage installation, retention reservoir, outlet to the ditch - underground gas installation - installations for sports pitch facilities buildings - irrigation and drainage installations (drainage) of pitches In the field of power and telecommunications installations, Stage 1 includes in particular: - supply of stage 1 - lighting of the area within stage 1 - technical sewerage within stage 1 (sewerage for optical fibres) - supply of sanitary equipment in the field (e.g. supply of pumping station - supply from the RGS3 switchgear) - supply of facilities and buildings within stage 1 - internal and external installations of facilities and buildings within stage 1 - electrical and telecommunication installations inside buildings / objects within stage 1 - lightning protection installations in the field of raw condition of kindergarten, school, sports hall and community house buildings 4.Detailed description and method of performance of the contract is contained in the project documentation, constituting Annex 10 to the SWZ. 5. Execution and maintenance throughout the entire period of implementation of the illuminated (2 pcs.) advertisement, located on the Investment site, showing the visualization of the target appearance of the CRS (graphics-printed on the blockout banner, one-sided printing). The dimensions of the board are: height 5,0m and width. 15,0m. Performing permanent digital recording of the image from the works site and providing live view. After completion of the project, the Contractor will be required to provide a time-lapse film illustrating the course of the project, a presentation time of 2:4 minutes, as well as presentations illustrating the course of the project in 3-month periods. Text automatically translated in your browsing language Automatically translated
45317300 - Electrical installation work of electrical distribution apparatus
45311000 - Electrical wiring and fitting work
45311100 - Electrical wiring work
45312310 - Lightning-protection works
45200000 - Works for complete or part construction and civil engineering work
45111200 - Site preparation and clearance work
45112210 - Topsoil-stripping work
45100000 - Site preparation work
71353200 - Dimensional surveying services
45232140 - District-heating mains construction work
45314000 - Installation of telecommunications equipment
45314120 - Installation of switchboards
45314200 - Installation of telephone lines
45310000 - Electrical installation work
45262350 - Unreinforced-concrete work
45110000 - Building demolition and wrecking work and earthmoving work
45262311 - Concrete carcassing work
45112200 - Soil-stripping work
45262310 - Reinforced-concrete work
45300000 - Building installation work
45311200 - Electrical fitting work
45231300 - Construction work for water and sewage pipelines
45212000 - Construction work for buildings relating to leisure, sports, culture, lodging and restaurants CVP code deduced from the text of the procedure AI-generated
Type: price
Description: Zasady oceny ofert w kryterium Cena (C)- waga 60%: C=cena najniższa brutto/cena oferty ocenianej brutto* x 60% * spośród wszystkich złożonych ofert niepodlegających odrzuceniu Podstawą przyznania punktów w kryterium "cena" będzie cena ofertowa brutto podana przez Wykonawcę w Formularzu Ofertowym, stanowiącym Załącznik nr 1 do SWZ.
Weight (percentage, exact): 60
Criterion:
Type: quality
Description: Gwarancja jakości Okres gwarancji jakości, liczony pełnych miesiącach, od dnia podpisania protokołu odbioru końcowego: * 60 miesięcy - 0 pkt * 84 miesiące - 40 pkt. Podstawą przyznania punktów w kryterium "gwarancja jakości" będzie okres gwarancji podany przez Wykonawcę w Formularzu Ofertowym, stanowiącym Załącznik nr 1 do SWZ. Określenie przez Wykonawcę okresu gwarancji w więcej niż jednym przedziale lub brak wskazania go w ogóle spowoduje przyjęcie przez Zamawiającego domniemania, iż Wykonawca zaoferował minimalny, tj. 60-miesięczny okres gwarancji.
Weight (percentage, exact): 40
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.