Published01/07/2026
-
Deadline04/08/2026
-
Today08/08/2026
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Hydraulic groundwater remediation
Provision/operation/maintenance of a groundwater remediation plant (GWRA) for cleaning with LCKW kontam. Groundwater (GW), throughput at least 8 m³/h. The GW has a higher organic load and concomitant pollutants from a landfill. The previous GWRA has a ventilation, de-ironing, stripping system with circular gas routing, KatOx system and HCI dosing as well as 5 conveying pumps. The plant shall be installed and operated until 2035 and then dismantled. The existing infrastructure (wells, pipelines, e-connection, infiltration well )) exists, as a GWRA has been in use since 2020. For competitive reasons, this GWRA will be re-tendered.
https://www.meinauftrag.rib.de
https://www.meinauftrag.rib.de
Type: price
Description: Der Zuschlag wird gemäß § 58 Abs. 1 VgV nach Maßgabe des § 127 GWB auf das wirtschaftlichste Angebot erteilt.
Weight (percentage, exact):
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.