-
Published31/10/2025
-
Today14/11/2025
-
Deadline02/12/2025
Utilities
- indicates text translated automatically in your browsing language
Lift systems Text automatically translated in your browsing language Automatically translated
The Authority for Justice and Consumer Protection intends to free up a sub-area of the current site of the Fuhlsbüttel prison that is no longer needed for the penitentiary system. For this purpose, it is planned to relocate the use units of the institution located on the sub-area to the area still in use by realizing two new buildings. The current supply structure of the JVA Fuhlsbüttel as well as the routings on the premises of the institution have to be adapted due to the free movement of the sub-area. In addition, the external security of the Fuhlsbüttel JVA must be redesigned and relocated in parts in order to delineate the remaining area of the institution from the part to be cleared. For this purpose, some existing buildings of the institution are to be completely or partially dismantled.// A total of 3 elevator systems are to be installed at the site of the JVA Fuhlsbüttel. The new building A of a training building with ground floor and 3 upper floors with an area of about 4,300 m2 is planned. Two elevators are installed. A load lift as a machine roomless cable lift with the cabin dimensions 1,800 x 2,700 mm and a payload of 2,500 kg. The elevator has 2 stops (ground floor / 1st floor). On the 1st floor as a loader. The cab is planned with ramming protection in standard design. A passenger elevator with 4 stops (ground floor, 1st to 3rd floor). OG) as a machine roomless cable lift with reduced shaft head. The load-bearing capacity is 1,000 kg with a nominal speed of 1.0 m/s. The cab is planned as standard. The new building B of a garage and administration building is planned with ground floor and 3 upper floors with an area of GFA of about 2,000 m2. A passenger elevator with 4 stops (EG, 1st to 3rd floor). OG) is installed as a machine roomless cable lift with a reduced shaft head. The load-bearing capacity is 1,000 kg with a nominal speed of 1.0 m/s. The cab is planned as standard.// For 2 buildings with approx. 4.30m2 and approx. 2.00m2 GFA - construction site equipment - installations of elevator technology incl. WuM planning// The execution must start immediately after the order has been placed (security check, ordering, planning). The work shall be completed as follows: - Building A no later than 07.01.2028 - Building B no later than 01.02.2028 Text automatically translated in your browsing language Automatically translated
https://bieterzugang.deutsche-evergabe.de/evergabe.bieter/api/supplier/external/deeplink/subproject/3ea2c5c0-0ba7-4d2f-8219-3b3773a17c77
https://bieterzugang.deutsche-evergabe.de/evergabe.bieter/api/supplier/external/deeplink/subproject/3ea2c5c0-0ba7-4d2f-8219-3b3773a17c77
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.