-
Published22/05/2025
-
Today22/06/2025
-
Deadline23/06/2025
-
Opening of tenders23/06/2025
Utilities
- indicates text translated automatically in your browsing language
Acquisition of a central storage solution Text automatically translated in your browsing language Automatically translated
General storage requirements: In the framework of the development, for the sake of full integration, maximum compatibility, interoperability of the components and professional support from the manufacturer, and for the sake of easy and safe operation in the future, the components can only come from one manufacturer. Requirements for the specific storage configuration to be delivered: • One central NVMe flash storage with two controllers • Data protection dynamic RAID, single drive failure protection (single parity, ‘RAID-5’) • Capacity: 128 TiB effective (usable) capacity, 32 TiB net actual capacity, with 12 x 3.84TB NVMe SSD drives • Upgradable to 90 drives or more • Storage with 4 Intel Xeon CPUs (2 per controller), 40 CPU cores or more, 2.4GHz clock speed • Storage with 384 GB or more DRAM cache (192GB/controller) • Ports with at least: o 8 x 25GbE SFP28 (without SFP) o 8 x 32Gb FC Optical SFP (with SFP) Text automatically translated in your browsing language Automatically translated
https://ekr.gov.hu/eljarastar/eljaras/EKR000790572025
https://ekr.gov.hu/eljarastar/eljaras/EKR000790572025
Type: price
Description: Összesen (egyösszegű ajánlati ár) nettó EUR
Weight (percentage, exact): 100
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.