-
Published05/11/2025
-
Today17/11/2025
-
Deadline20/11/2025
-
Opening of tenders21/11/2025
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Max Planck Institute for Evolutionary Biology in Plön, extension of institute building, shell work incl. demolition work (renovation) Text automatically translated in your browsing language Automatically translated
Note: Not all information for this procedure were successfully computed. Please consult linked documents for more details.
Content of the services listed in accordance with the schedule of services is the provision of demolition services including pollutant disposal in the existing building - "Pharmaceutical refurbishment: (PAK-loaded insulation board bottom: approx. 1,250 m2; Mineral fiber floor insulation up to 40mm: approx. 1,250 m2; KMF ceiling: approx. 1,250 m3; u.s.w.)" - "BREAKDOWN WORK CONTINUED: (Floor coverings, such as linoleum and PVC: a total of approximately 1,900 m2; Floor insulation Mineral wool, waterproofing and cement screed: approx. 1,250 m2 each; Windows incl. window sills: approx. 80 pcs; Demolition of interior walls MW: approx. 720 m2; u.s.w.)" - "BASIC INFRINGEMENT STATE: (pit: approx. 30 m3; Filling base: approx. 33 m3; u.s.w.)" - "MAUERWERKSARBEITEN STAND: (CS interior walls: 200 m2)" - "CONCRETE AND STEEL-CONCRETE WORK CONTINUED: (Breakthroughs and recesses, different diameters: approx. 430 pcs; Reinforced concrete base plate WU-concrete: approx. 2.50 m3; u.s.w.)" - "INTRODUCTION CONTINUED: (undertaking stock DSV: approx. 20 m3; u.s.w.)" - "PUTZARWEITEN AN INTERNALWÄNDEN: (Interior plaster of plaster: approx. 2,000 m2; Special note concerning bidder questions due to special external events (e.g. Sars-COV-2 or Ukraine war): When preparing your offer, please take into account any possible or identifiable impairments, e.g. in relation to the availability of materials and products, workers, a possibly delayed provision of required evidence, effects on any subcontractors, etc. Questions that arise in this context, we ask you to submit in good time before the offer deadline via the eProcurement message system. Execution deadlines: Execution shall begin within 12 working days of receipt of the request by the Customer (Section 5(2), second sentence, VOB/B). The request will be sent to you in advance by 2.1.2026. The service must be completed (ready for acceptance) within 210 working days after the aforementioned deadline. (6 working days/week) Text automatically translated in your browsing language Automatically translated
https://bieterzugang.deutsche-evergabe.de/evergabe.bieter/api/supplier/external/deeplink/subproject/508055e9-7ae2-4ef0-83cf-375d03a1d214
https://bieterzugang.deutsche-evergabe.de/evergabe.bieter/api/supplier/external/deeplink/subproject/508055e9-7ae2-4ef0-83cf-375d03a1d214
45262800 - Building extension work
45262660 - Asbestos-removal work
45262690 - Refurbishment of run-down buildings
45400000 - Building completion work CVP code deduced from the text of the procedure AI-generated
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.