-
Published16/06/2025
-
Today13/07/2025
-
Deadline15/07/2025
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
BLB NRW DU / Essen / UDE / New building Didactics of Chemistry / Quality Assurance (020-25-00109) Text automatically translated in your browsing language Automatically translated
The Bau- und Liegenschaftsbetrieb NRW, NL Duisburg intends to build a new Didactics of Chemistry (DdC) for the University of Duisburg-Essen (UDE) on Campus Essen, as the currently used rooms at the Schützenbahn for the measure to be planned are no longer suitable for current and future use. The aim of the measures is to adapt the DdC to future requirements in terms of surface area and to intrigue the flexibilisation of workspaces in the process. From the point of view of BLB NRW and Landessicht, a new building (acquisition of usable space from existing buildings) on the main campus (WE2038) is the rational variant. This offers the highest degree of fulfilment in terms of feasibility and demand, life cycle cost forecasting, conformity, construction law and campus development planning, accessibility of the BNB silver standard, feasibility of the EG40 standard as well as fulfilment of the construction and state policy goals. The UDE DdC area is currently housed in the S-L and S-E buildings at the Schützenbahn site (WE 2039). However, in the laboratory areas, the necessary legal minimums have been partially exceeded and an insufficient technical infrastructure has been found. A refurbishment is therefore excluded. The new building serves the training of chemistry teachers. The new DdC building is to be built using the SEP contract model (turnkey construction with integrated planning) including commissioning as a partnership in a profitable AG-AN relationship. For this purpose, all planning and construction services are to be awarded to a total contractor (TU) on the basis of the integration of the contractor's technical and logistical expertise. The aim is to jointly define the actual construction target at an early stage and to limit the project risk for both parties, with increased security and transparency in terms of costs, deadlines and qualities and the minimisation of interfaces in planning and execution as well as between the project participants. The contract is awarded to the total contractor on the basis of a functional service description (FLB), which must be drawn up by the quality assurance department to be commissioned. The preparation of the building application and the obtaining of the building permit is the responsibility of the total contractor. Approval authority is the city of Essen. The coordination of the planning trades is carried out by the AN TU. The procedure is divided into the SEP phases below. The designation of the phases is based on the subdivision into stages of the AHO services of the project management. The respective assigned AHO services of the project management (see Annex 3C Tender Specifications) can be seen in Annex 3D as a project phase matrix. In Annex 3E Procedure, a proposal graphically illustrates the procedure. More details can be found in the procurement documents. Text automatically translated in your browsing language Automatically translated
https://evergabe.blb.nrw.de/Vergabe/notice/CXS7YYXY1ZNNU4JD
https://evergabe.blb.nrw.de/Vergabe/notice/CXS7YYXY1ZNNU4JD
71000000 - Architectural, construction, engineering and inspection services
71210000 - Advisory architectural services
71200000 - Architectural and related services
71300000 - Engineering services CVP code deduced from the text of the procedure AI-generated
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.