-
Announced21/03/2025
-
Estimated published24/03/2025
-
Published03/04/2025
-
Today22/04/2025
-
Deadline05/05/2025
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
New building of a children's group in the village of Tobolka Text automatically translated in your browsing language Automatically translated
The solved object is a new building of a children's group in the cadastral area of Tobolka. The proposed building has a rectangular ground plan and its south-west corner is adjoined by an L-shaped roof of the entrance. The building has a built-up area of about 170 m2. It is a basement-free, single-storey building with an unused attic space on the half of the building. The dimensions of the house are designed approximately 16.5 × 9 m (main object – including roof overhang) and 5.8 × 5.12 m (entrance roof). Together with the building, additional buildings necessary for the functioning of the building and the operation of the children's group will be implemented on the investor's land. It is a downhill object, reinforced surfaces, NN connection, data connection, water supply, installation of impermeable sump and retention tanks for purified and rainwater and infiltration body. Furthermore, the demarcation of the parking space and garbage can, fencing, entrance gate and entrance gate. There will also be a garden house (system construction available in common hobby stores), playground elements, relaxation elements (benches, trash cans, etc.). The land will be newly fenced. The fencing will not be higher than 2.0 m. The fencing will be done using classic plastic-coated (wire) mesh with sub-base plates. The exception is the southern side of the plot (towards the regional road – class III road), where a fence of concrete blocks will be made. The concrete fence will have a base height of up to 0.75 m above the level of the adjacent terrain. In the pitch of up to 2.5 m, columns of a height of 1.0 m will be built. The filling between the columns will be made as maintenance-free, made of plastic fences in imitation wood (WPC material). The exit from the access road (from the plot of parc. no. 165/1) will have a gravel surface made of aggregate fraction 16/32 during the construction. Before the completion of the construction, the congress will be modified by interlocking pavement between the concrete curbs, according to the description below and according to the drawing documentation. The paved areas on the fenced part of the plot of parc. no. 41/8 will be mostly solved from interlocking pavement in a walkable structure (for pavements and space reserved for garbage cans), or in a structure for the load of cars up to 3.5 t (for taxiways). Parking spaces will be made of plastic solid grass blocks (blocks suitable for running surfaces must be used). Text automatically translated in your browsing language Automatically translated
https://nen.nipez.cz/profil/obecmenany
https://nen.nipez.cz/profil/obecmenany
45200000 - Works for complete or part construction and civil engineering work CVP code deduced from the text of the procedure AI-generated
45230000 - Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork CVP code deduced from the text of the procedure AI-generated
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.