-
Published04/08/2026
-
Deadline03/09/2026
-
Today15/09/2026
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Evangelisches Klinikum Gelsenkirchen new building psychiatry - demolition
The planned demolition measure serves to clear the construction site for an extension of the ev. Clinic of Gelsenkirchen. This includes the demolition of the former district court Gelsenkirchen (3- or 5-storey building with hip/saddle roof or flat roof) as well as an adjoining 2-storey institution building with various extensions. Furthermore, there is an underground former air protection room (bunker) from the 2nd floor, which is also to be demolished, on the site. World war. The total construction volume to be discontinued is approximately 60,000 m3 (BRI). The buildings of the former district court are partially basemented and directly adjacent to the street space (walkway and street) of Overwegstraße. The buildings were built at different times, the former district court (old building) at the turn of the century or the extension after the 2nd century. World War, partly underground and in some areas at risk of collapse. In some areas of the building structure, the professional removal and the intended disposal of various hazardous demolition materials such as asbestos, PCB, KMF, etc. must be carried out. The entire demolition takes place in the inner-city environment with immediately adjacent neighboring buildings and thus places high demands on the process and logistics of the demolition work.
https://www.vergabe.metropoleruhr.de/VMPSatellite/notice/CXPSYRJDQCK
https://www.vergabe.metropoleruhr.de/VMPSatellite/notice/CXPSYRJDQCK
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.