County Hall 2 at Hamar – Construction/renovation project consisting of a dental clinic and premises for Karriere Innlandet.
The cancellation competition is cancelled in accordance with PPR § 25-4 and a new competition will be announced shortly (expected within 2 weeks). There is a need to make significant changes in the tender documentation, which cannot be implemented without cancellation. The needs for changes are highlighted through questions from several relevant tenderers and deal with, among other things; day formula provisions and deadlines, award criteria environment EPD, uncertainties in the requirement specifications etc. In order to simplify the work of participating in the next round, we will document the changes that have occurred in a simple overview as a separate document and announce relevant questions and answers from this competition (including unanswered). Innlandet county would like all tenderers who have shown interest in participating in the new competition and who appreciate good input. Innlandet County shall co-locate Hamar dental clinic, Åkershagan dental clinic and Karriere innlandet in Fylkeshus 2 in Parkgata 54.The inspection will be held 12.02.2026. Meet at: County Hall in Parkgata 64, 2316 Hamar. Registration for a site inspection, with companies and the number of participants, will be sent in via the communication module in Mercell by 09.02.2026. Registered companies will get information on the date they meet.
https://permalink.mercell.com/274631773.aspx
https://permalink.mercell.com/274631773.aspx
45262700 - Building alteration work
45220000 - Engineering works and construction works
45210000 - Building construction work
45400000 - Building completion work
45300000 - Building installation work
45214000 - Construction work for buildings relating to education and research
45215100 - Construction work for buildings relating to health
Type: price
Description: Price
Weight (percentage, exact): 70
Criterion: EPD
Type: quality
Description: Completed EPD form EPD shall be delivered in accordance with NS-EN 15804+A2:2019+AC:2021 for offered products. Product name, reference to published EPD and GWP-total Per. Amounts for A1, A2, A3, A4 and B4 shall be stated in EPD form. Where a reference product has been specified, AN EPD shall be delivered for the reference product, and the same manufacturer will be used for other products within area, or products with equivalent or better the GWP total as offered. The EPD shall include the modules A1 - A4, as well as B4. Tenderers must document the prerequisites and measures that are the basis for calculating their EPDs. THE EPD must be valid (the normal validity is five years), third party certified and published in an EPD Programme. Operator. Project specific EPDs must refer to certified and published reference EPD Delivered EPDs will be seen as public In the evaluation, the column GWP total will form the basis, summed up for A1-A4, as well as B4. GWP total shall be stated per. quantity unit stated in the form. Lower kg CO2 equivalents are assessed as better than higher. The score will be calculated so that the lowest offered GWP total (A1-A4 + B4) per line achieves a full count (5 points). multiplied by the weight of the line) on each line and so that a doubling of GWP total compared to the lowest the offered gives 0 points. Higher GWP total than twice of the lowest GWP total also gives 0 points. Missing delivery of AN EPD for a product gives 0 points. GWP total between the lowest and twice the lowest, gears points calculated according to the following formula: 5*[weight of the line]*(2-[Offered GWP total]/[Lowest GWP total]) For a total point score on the award criteria, the sum of the points per line will form the basis. A tenderer will. thus only get a full payout on the award criterion if the he has offered the lowest GWP total for each line.
Weight (percentage, exact): 20
Criterion: Emission free machines
Type: quality
Description: A completed list of machines shall be used in Project. Points will be given based on the degree of emission freedom. This be done by multiplying the emission free degree by 5. An emission free degree of 100% will give 5 points and a top score, whilst an emission free degree of 50% will give 2.5 points, etc. A emission free degree of 0 will give 0 points for the relevant award criterium. Important! Tenderers are encouraged to read the "Guidelines" tab. machines", before the tab for "Machines on Tenders" is filled Out. Please note that only the stated machines and stated use of these that shall be located at reason for the execution. Changes of machine type/ machine size, conduit or stated use can only as long as the degree of emission freedom is not lower. The degree of emission freedom must also be maintained in connection with any release of options. Any changes shall, nevertheless, always be approved by Principal. Before the start-up, the contractor shall provide information on: the individual machines that shall be used (registration number in the vehicle register/machine register, number of motor hours, etc.). When the machines are moved away from the construction site, the contractor shall provide information on this and report on the number of engine hours. Power capacity at the construction site: The main distribution in County Hall 2 (in level U2) is ensured. with 630A in the main board room in County Hall 1. This is 230V IT. The capacity of the entire intake is approx. 250 kVA. There are existing departures in the main distribution of 250A and 125A, equivalent to respectively approx. 100 kVA and 50 kVA. I there is also a 400A departure (group protection in air-raid shelters), equivalent to approx. 160 kVA
Weight (percentage, exact): 10
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.